Punch List — June 6 2012 1. Five Palms — TOP PRIORITY - Laying conduit and pulling cable —continues - Exterior Door Shutters — PO rejected by JE, on hold awaiting design - Painting — inside completed 5/30 Outside to be completed after visit - Furniture — Sofa — leather samples JE will review while on site - Desk, Rug, Lamps installed - Lights — Parrots finished, awaiting approval on down lights - Mirrored siding — Panels ordered — WA to Tropical FL 6/7 — scheduled to sail 6/8, EDA on STT 6/12 Glue on site - Tapestry Molding for Ceiling — bid rejected, need to review design with JE - Transformer building — Building 5/31, 5/25 — final electrical hookup 6/8 — temporarily powered by generator - Flooring — installed - Fire pit — gas and grate coming down on plane - Books — books on site will relocate over the week of 6/4 - Benches — two benches out back - Road grading 2. Grotto - - Floor resin - Genset wiring — scheduling to be determined 3. Berm/Top of Hill - dirt and rock needs on top of hill needs to go ASAP - hydroseed top of hill —4 large planter boxes with small planter inside require construction —size to be determined by JE - cleanup and excavate — continues - remove rock screener - completed 4. Engineering/Maintenance Yard - Steel Shed — foundation in progress - Metal Sheets on old building will be replaced week of 6/4 5. Triangle —landscaping direction required from JE 6. Flagpole Pool Cabana - - Recovering of sofa/chairs — completed, need to review piping with JE while on site - Furniture - review another piece of furniture — Sarah 7. Entry Tree Lights — installation complete 8. Solutions for Generators — Sound proofing solution forwarded to JE, require direction , wall built 9. Tiki - shields with the vendor in Wewak (5/4) — working on the permit to export — will take 1 to 2 weeks 10. Dock — - Decking — replace all damaged boards and carpet complete - Floating Dock - - Jet ski Docking - review - Table/Dock Box — Bill star