From: LAllenby To: "jeffrey E." <[email protected]> Cc: Richard Kahn Subject: Re: LSJ Plate Work Date: Mon, 03 Aug 2015 13:38:39 +0000 Good Morning Upon reviewing and inspecting the inside of the compartments, forward of the engine room, we have come up with a quotation for repairing all the "wasted" plate. Approximately 160 square feet of plate has to be cut out and replaced. The square footage equals 848LBS x $45 per pound the total would be $38,160 (This price includes all labor and material). We will also have to remove both keel coolers due to their location with the plate that has to be cut out. We will also have to fabricate two new boxes in which they sit and then remount these boxes once the new plate is welded into place. The price for this is $5850 includes labor and material. Two water tight bulkheads are also compromised and several areas will need to be "cropped" out and replaced. Labor and materials is $3380. We will also "plug weld" 12 more additional areas that have deteriorated and need to be addressed. These two compartments have been inspected by both Gabriel, the project manager, and Bosco. In addition, the emergency bilge pump system needs to be renewed and it is our recommendation to have Bosco undertake this job. Please note that we have not charged any additional lay days and will continue not to. The areas that need to be cut out and replaced are very confined and difficult to work in. With the savings on lay days it is over $3500 so we will not be able to move on our final quotation. I have also attached a few pictures Total for labor and material $47,390 Leighton Allenby Director of Properties On Aug 3, 2015, at 9:21 AM, jeffrey E. <[email protected]> wrote: that is only the problem„ is there a proposal for solution, ? please try to add action steps to issues, telling me only that there is a problem is time consumig On Mon, Aug 3, 2015 at 9:13 AM, LAllenby < > wrote: EFTA00708414