WEEKLY REPORT FRIDAY SEPTEMBER 6, 2002 ACTION POINTS REOUIRING JE's COMMENT 71ST STREET i) JE to still use the Thalgo massage table heating blanket before advising if we are to purchase for any other property. ZORRO ii) is aware that the tent needs to go near Hogs Back but is unsure where — please advise? iii) Where would JE like the Ponce de Leon placed, or should this be placed in storage? iv) On discussion between GM, and NS, it was agreed that a further two vehicles for the ranch are required with regard to the transportation problem encountered during JE's previous visit — namely a Tahoe and Suburban. JE to please advise if it would prefer us to source new or used vehicles? v) JAI has a further quote for the electric portion of the plumbing project from Broken Arrow in the amount of $6,900.00. This is the best quote she has received as the other two quotes were $12k and 14K. JE to plse approve. vi) Nanna — This is repaired and in the water. The boat needs to be detailed and cleaned which involves teak deck dressing etc. This is scheduled for next week. Due to the pending visit, I can put this project on hold. Please advise? vii) Hot Tub — This has been installed. Mr Epstein requested that the temp be increased. The programming pumps and solenoids are designed for the current temp. The temp is set at this maximum level to avoid any liability claims for injury caused by the water getting too hot. To increase the temp further would require extensive alterations. Is Miles to go ahead? viii) The plans calling for a wooden gym have been altered to allow for the use of cement floors and walls. JE would like the outer face of the building stoned as per main house. The structure will remain the same in terms of structure and dimensions. This has been approved by JE. Progress - Miles has started the process of moving the existing gym to a new location. This should be completed by Friday September 6. Thereafter they will start the g