Punch List — May 12. 2012 1. Flagpole Pool Cabana - - Recovering of sofa/chairs - to be completed via JE direction in May — project to commence 5/15 Furniture - review another piece of furniture — Sarah - Lighting - more down lights outside 2. Main Compound - - Landscaping — purchase goat's foot vine on hillside —investigating options/price forwarded 5/4 - Entry basket - purchase Bougainvillea (bright red); fill in front of basket with more dirt - repairing of coral stone deck areas - coral stone thresholds in guest rooms need to be cut 3. Five Palms — TOP PRIORITY - Trenching — in progress - Electrical/Phone/Data — reviewing in house option — pull boxes - Exterior Door Shutters - require JE approval - Interior Doors — install new glazing week of 5/21 - handles need to be large - Painting —final outside coat to be completed once all work is finished - Waterproofing - Furniture — X 2 cannonball lamps, bronze lamp — on site - Sofa — purchase - Rug — on site - will be cleaned before it is installed - Karen - Built in Cabinets/shelves — to be completed by Bill — hinges for cabinet doors on LSJ — work ongoing - Landscaping — level dirt - continuing — relocate grasses — continuing - Lights— outside light boxes on the mirror and shutter door side need to be covered - light parrots and building — from roof line (rectangular 24 X10) - sconces are the same as everywhere else - Desk— EDA on STT 5/15 - Mirrored siding — on LSJ 5/9 — installation to begin week of 5/14 - Framed Photos — JE to review 4/30 4. Grotto - - Pavilion — painting in progress - white - Landscaping — more dirt required on left hand side as you look down, then hydroseed - Shutters/generator doors/storage doors — ??? - Genset wiring — scheduling to be determined 5. Hangar — - Concrete Floor — painting in progress - Painting — interior paint selected - Silver Polaris - from LSJ relocated to hanger, purchase new vehicle for LSJ 6. Steel Shed — ABC Concepts proposal forwarded