Prime Renovations & Painting 11 Cora Court Hampton Bays New York 11946 U.S.A (917)287-2878 (631)680-2238 Bill To Mervin Dela Cruz 9 East 71 St New York 10021 New York Estimate Estimate Date : # EST-1176 10/25/18 Item & Description Jt 1 SCOPE OF WORK: Site protection protect all work areas using masonite boards protect any walls as needed with plastic covers protect bedroom floors and walls during the duration of the work 2 Plumbing Prier demolition 1. shut down water to the steam shower, toilet room and sink remove all plumbing fixture 2. remove toilet water line as well as waste line 3. relocate water lines including steam head outlet relocate controllers 1.00 5,000.00 5,000.00 1.00 9,500.00 9,500.00 3 Demolition: 1.00 11,500.00 11,500.00 1. Remove 3 brass doors leading into the steam room, shower & toilet MOM Steam Shower 2. completely demo by removing all the stone and cement boards from the ceiling, walls, floors and benches 3. completely remove wall between toilet room and steam shower to expand steam room Toilet Room 4. completely demo by removing all stone and drywall boards from ceiling, walls and floor Sink area 5. completely demo sink wall by removing all stone and drywall boards and framing Cart away all debris 4 1.00 37,000.00 37,000.00 EFTA00521485