Prime Renovations & Painting 12 Cora Court Hampton Bays New York 11946 U.S.A (917)287-2878 (631)680-2238 Bill To Mervin Dela Cruz 9 East 71 St New York 10021 New York Estimate Estimate Date : # EST-1172 10/10/18 :JUG. Qt, Rate Amount 1 SCOPE OF WORK: Site protection protect all work areas using masonite boards protect any walls as needed with plastic covers protect bedroom floors and walls during the duration of the work 2 Plumbing Prier demolition 1. shut down water to the steam shower, toilet room, walk•in shower & sink remove all pluming fixture trim remove toilet, sink vanity temporary cap all water lines and drains during the duration of work After all finish work has been completed 2. reinstall all trim fixtures, toiletsink and vanity 1.00 5,000.00 5,000.00 1.00 9,500.00 9,500.00 3 Demolition: 1.00 24,000.00 24,000.00 1. Remove 3 brass doors leading into the steam room, shower & toilet room after completion of the work to be reinstalled Steam Shower 2. completely demo by removing all the stone and cement boards from the ceiling, walls, floors and benches Walk•in shower 3. completely demo by removing all stone and cement boards from ceiling, walls, and floor Toilet Room 4. completely demo by removing all stone and drywall boards from ceiling, walls and floor Sink area 5. completely demo by removing all stone and drywall boards from ceiling, walls and floor Cart away all debris 4 Finish Work: 1.00 42,000.00 42,000.00 EFTA00521482