{"efta_number": "EFTA02672011", "page_count": 3, "url": "https://epstein-data.com/EFTA02672011", "pdf_url": "https://epstein-data.com/pdf/EFTA02672011.pdf", "pages": [{"efta_number": "EFTA02672011", "page_number": 0, "text_content": "From:\nSent:\nTo:\nSubject:\nJeffrey Epstein <jeevacation@gmail.com>\nTuesday, December 10, 2013 8:44 PM\nEric Roth; Ivjet; Richard Kahn\nRe:\nyou were going to give me options for entertainment, three times already, so far nothing with prices and or\nschedules. =A0. please provide today. it should not be larrys responsibli-y we paid 50k for the system that is faulty,.\nplease call the shade man place again, telling me we called but have not heard back is sil=y.\nOn Tue, Dec 10, 2013 at 3:35 PM, Eric Roth\nDecember 9, 2013\nwrot=:\nAir Gaspers -\nSquawk: Cabin area air gaspers do not sea= 100% and the pressure causes a \"hissing sound\".\nStatus: Larry has procured gaspers and plenums. We noticed that they did not come with the wire clamps, so\n=e will have to order them for you. We shipped one gasper overnight to L=rry for delivery on 12/10 so that he may show\nit to you to identify if you want them plated or not.\nEst. Time Required: Metal plating w=ll take approximately 10-12 days. Once gaspers are ready for\ninstal-ation, IJI will require 3-4 days to trim escutcheons and install the g=spers.\nUpwash Lighting-\nSquawk: Various light fixtures are inte=mittent.\n1\nEFTA_R1_01944246\nEFTA02672011\n", "char_count": 1189}, {"efta_number": "EFTA02672011", "page_number": 1, "text_content": "Status: Each light bulb and associated power supply ballas=will need to be tested. IJI recommends replacing the\nlight bulbs as a means of testing and perhaps more importantly to have even coloration througho=t the cabin.\nEst. Time Required: IJI will requir=1-2 days to troubleshoot. Dependent upon finding, it may take 1 =96 3 days\nto correct.\n=AO\nR/H #2 VIP Master Switch Panel-\nSquawk: Client would like to have t=e R/H #2 master switch panel reworked by manufacturer to have it\nreprogram=ed to control the shades \"ALL UP\" and \"ALL DOWN\".\nStatus: The switch panel was going =o be removed at Gulfstream and sent to the manufacturer for a return on\nth= 20th and I found out today that this is not going to happen.=AO\nEst. Time Required: Manufacturer ha= stated they will \"commit\" to a two (2) week turn around to reprogram\n=he panel and replace a few internal parts.\nWindow Sha-es-\nSquawk:=AO Pleated window shade material within the window panel assemblies in the=main cabin are\n\"wrinkled\" at the pleats.\nStatus: We sent an e-mail with phot='s and waiting for vendors response including downtime required.\n<=>Est. Time Required: Waiting on vendor.=/b>\n=AO\n=/b>\nTable Lid-\nSquawk: Client would like to route the inboard vertical surface to provide an easier opening of lid.\nStatus: IJI has identified ½ moon-shape and rectangular shape. Need JE decision..\nEst. Time Requ=red: Route and paint to coordinate - 2 days.\n2\nEFTA_R1_01944247\nEFTA02672012\n", "char_count": 1448}, {"efta_number": "EFTA02672011", "page_number": 2, "text_content": "=AO\n=/b>\n=AO\nMaintenance Runne=-\nSquawk: =Need to fabricate vinyl maintenance runner. eroth@int-jet.com <mailto::eroth@intljet.com>\nwww.intljet.com <http://www.intljet.com/> =AO jeevacation@gmail.com <http://twitter.com/#!/intljet>, and\ndestroy this communication and all copies thereof,\nincluding all attachm=nts. copyright -all rights reserved\n3\nEFTA_R1_01944248\nEFTA02672013\n", "char_count": 378}]}