{"efta_number": "EFTA02672002", "page_count": 4, "url": "https://epstein-data.com/EFTA02672002", "pdf_url": "https://epstein-data.com/pdf/EFTA02672002.pdf", "pages": [{"efta_number": "EFTA02672002", "page_number": 0, "text_content": "From:\nSent:\nTo:\nCc:\nSubject:\nEric Roth<\nTuesday, December 10, 2013 8:37 PM\n'Jeffrey Epstein'\n'Larry Visoski'; 'Richard Kahn'\nRE:\nAttachments:\nimage004.jpg; image005.jpg; image006.jpg; image007.jpg; image008.jpg;\nimage009.jpg\n=AO❘ PRESIDENT\n=img width=205 height=58 id=\"_x0000_11030\" =rc=\"cid:image004.jpg@01CEF5BD.9C71A280\" alt=\"IJI Logo - =orizontal-\nSMALL\">\nhref=\"mailto\nFrom:</b>=ric Roth [mailto:\nSent: Tuesday, December =0, 2013 3:36 PM\nTo: 'Jeffrey Epstein'\nSubject: RE: =o:p>\n</=:p>\n</=:p>\nAir Gaspers =o:p>\nSquawk: =abin area air gaspers do not seat 100% and the pressure causes a =#8220;hissing sound\".\n1\nEFTA_R1_01944203\nEFTA02672002\n", "char_count": 644}, {"efta_number": "EFTA02672002", "page_number": 1, "text_content": "Status: Larry has procured gaspers and plenums. We noticed that they did not come with the wire =lamps, so we will\nhave to order them for you. We shipped one -asper overnight to Larry for delivery on 12/10 so that he may show it =o\nyou to identify if you want them plated or not.\nEst. Time Required: Metal plating ill take approximately 10-12 days. Once gaspers are ready =or installation, IJI will\nrequire 3-4 days to trim escutcheons and install the gaspers.\nUpwash Lighting-\nSquawk: Various light fixtures are =ntermittent.\nStatus: Each light bulb and -ssociated power supply ballast will need to be tested. IJI recommends =eplacing the light\nbulbs as a means of testing and perhaps more =mportantly to have even coloration throughout the cabin.\nEst. Time Required: IJI will =equire 1-2 days to troubleshoot. Dependent upon finding, -t may take 1-3 days to\ncorrect.\nR/H #2 VIP Master Switch -anel-\nSquawk: Client would like to have =he R/H #2 master switch panel reworked by manufacturer to have it =eprogrammed\nto control the shades \"ALL UP\" and \"ALL =OWN\".\nStatus: The switch panel was going =o be removed at Gulfstream and sent to the manufacturer for a return on -he 20th\nand I found out today that this is not going to =appen.\nEst. Time Required: Manufacturer as stated they will \"commit\" to a two (2) week turn around =o reprogram the panel\nand replace a few internal =arts.\nWindow=hades-\nSquawk: Pleated window shade =aterial within the window panel assemblies in the main cabin are =#8220;wrinkled\" at\nthe pleats.\nStatus: We sent an e-mail with =hoto's and waiting for vendors response including downtime =equired.\n2\nEFTA R1 01944204\nEFTA02672003\n", "char_count": 1658}, {"efta_number": "EFTA02672002", "page_number": 2, "text_content": "Est. Time Required: Waiting on endor.\nTable Lid-\nSquawk: Client would like to route he inboard vertical surface to provide an easier opening of lid.\nStatus: IJI has identified =oon shape and rectangular shape. Need JE decision..\nEst. Time Required: Route and aint to coordinate - 2 days.\nMaintenance Runner-\nSquawk: Need to fabricate vinyl =aintenance runner.\nStatus: Waiting on color choice by =E.\nEst. Time Required: 2 days after =eceipt of material (material should be in stock).\nFwd=abin Monitor-\nSquawk: Fwd cabin monitor is =aulty.\nStatus: Sent monitor to =anufacturer for warranty. Replaced with temporary monitor which =as been determined by\nGulfstream Savannah to also be faulty. =nformed manufacturer that client is very unhappy with this model and -hat he\nwould like to move away from this model and replace it with a HD =onitor.\nEst. Time Required: Waiting on eply from manufacturer to see if they will accept the return and =rovide a credit\ntowards a new HD monitor.\n3\nEFTA R1 01944205\nEFTA02672004\n", "char_count": 1012}, {"efta_number": "EFTA02672002", "page_number": 3, "text_content": "Entertainment System -\nSquawk: JE wants to upgrade =ystem.\nStatus: Larry is testing the Bose =ystem to see if JE likes it.\nEst. Time Required: Once JE has =dentified that he would like to move in this direction, we will prepare = quote\nincluding cost and time required.\n=nbsp;| PRESIDENT\n-img border=0 width=205 height=58 id=\"Picture_x0020_1\" =rc=\"cid:image007.jpg@01CEF5BD.9C71A280\" alt=\"IJI Logo -\n=orizontal-SMALL\">\n=o:p>\nFrom:</b>=effrey Epstein [mailto:jeevacation@gmail.com]=br>Sent: Tuesday, December 10, 2013 3:37 PM\nTo: Eric =oth; Ivjet; Richard Kahn\nSubject: =o:p>\nyou =old me i would receive a detailed scedule either late yesterday or this morning, both have past\n--=br>*\nThe =nformation contained in this communication is confidential, may be =ttorney-client privileged, may constitute\ninside information, and is intended only for the use of the addressee. It is the property of Jeffrey Epstein Unauthorized\nuse, disclosure or copying of his communication or any part thereof is strictly prohibited and may be unlawful. If you\nhave received this communication in error, -lease notify us immediately by return e-mail or by e-mail to\njeevacation@gmail.com, and destroy this =ommunication and all copies thereof, including all attachments. =opyright -all\nrights =eserved\nEFTA_R1_01944206\nEFTA02672005\n", "char_count": 1311}]}