{"efta_number": "EFTA02621650", "page_count": 1, "url": "https://epstein-data.com/EFTA02621650", "pdf_url": "https://epstein-data.com/pdf/EFTA02621650.pdf", "pages": [{"efta_number": "EFTA02621650", "page_number": 0, "text_content": "From:\nSent:\nTo:\nCc:\nSubject:\nKyle reavis <\nFriday, September 28, 2018 1:08 PM\njeffrey E.\nbrice gordon; Richard Kahn\nBarge Ramp\nMr Epstein,\nDupson is finished with the-dock apron and I wanted to confirm we will have him move onto the barge ra=p next.\nHe will need to collect stone over the next few days for the ramp. The design to confirm is to ma=ch the dock apron\nvisually. Do you want any boarders like on the dock apro=?\nThe process will be as follows;\n<=div>\n-Collect stones\n-Jack-Hammer up stones (2\" removed from surface) -Stone Facade- this will be set on top of rough su-face, we will be\nusing a bonding agent (most likely Intralock) to bond the=new cement to the set concrete to add more compression\nstrength for the li-e loads coming off the barge\nWe can do a small section first if you would like. Please let me know what you thin=. Thank you!!\nVery Respectfully,\n=br>\nKyle Reavis\nEFTA_R1_01828669\nEFTA02621650\n", "char_count": 923}]}