{"efta_number": "EFTA02499530", "page_count": 2, "url": "https://epstein-data.com/EFTA02499530", "pdf_url": "https://epstein-data.com/pdf/EFTA02499530.pdf", "pages": [{"efta_number": "EFTA02499530", "page_number": 0, "text_content": "From:\nSent:\nTo:\nSubject:\njeffrey E. <jeevacation@gmail.com>\nFriday, May 29, 2015 1:29 PM\nAnn Rodriquez\nRe: LSJ Big N progress\nask him if he thinks we should replace the cores. engines=C2�> etc\nOn Fri, May 29, 2015 at 9:26 AM, Ann Rodriquez\n<J=>\nAnn R.\nBegin forwarded message:\nFrom: gene kral\n=b>Date: May 29, 2015 at 9:23:19 AM AST\nTo: Ann Rodriquez <\nSubject: LSJ progress\nReply-To:=gene kral <\nkmailto:g\n<mailto:\n<mailto\nwrote:\nGood Morning Ann\nWork is progressing as planned. Today, w= will be finished with pressure washing the engine room;we\nremoved all floor plates, scraped off oil degreased sides and overhead. Additional work we=will not charge for will be: 1)\nadding supports under the hatch =where it was; 2) modify to accommodate your control tower. This area as not\nthought out very well and allowed sea and rain water to =eak on rear of engines causing rust and corrosion. We will\nalso repa=r several deck fitting that were compromised and allowed the elements into-engine room. We are also going\nto renew most of the aluminum floor pa=els with no extra charge.\nElectrical work is progressing and new engine gauges are installed=\nNew engine exhaust is progressing using all ne= using 316-L stainless steel; one new muffler is in place.\n1\nEFTA_R1_01625954\nEFTA02499530\n", "char_count": 1283}, {"efta_number": "EFTA02499530", "page_number": 1, "text_content": "Existing Hydraulic system is removed in it entirety and a new system is being designed.\nNew receiver tank is fabricated-and waiting for installation\nStbd fuel tank is opene= and fuel drained and tank cleaned. Port side is now being worked on.\nRudders have new flanges and are now set on the welding table for reinstallation.\nEngine alignment is beginni=g and new cutless bearing will be installed next week; couplings are in th=\nmachine shop to be resurfaced.\nLSJ will be in the yard for another 4 to 5 weeks.\nI would like to take this time to revie= the engines. No one has been here servicing engines and we are\nat the point that another person coming here will be in the way. From what I have bee- told, the valve covers need new\ngaskets (4) and the starters need a inspe=tion, new air filters, and cleaning of engines so a primer/topcoat can be\n=pplied. New fuel lines and new plumbing for heat exchangers.\nRemember this was something not quoted-on.. If you want us to make these improvements, I would\nquote a additional=8K total.\nIf you don't want to take this extra c=arge on now, I would advise to wait until we are complete so we\nare not in each other's way.\nTha=ks\nGene\nGene Kral Sr.\nSubbase Drydock, In=.\nParcel 162, Subbase\nSt. Thomas, USVI 00802\nTEL:\nFAX: (340) 779-8426 <tel:%28340%29%20779-8426>\nwww.subbasedrydock.com <http://www.subbasedr=dock.com>\n=/div>\n=C2 please note\nThe information contained in t-is communication is\nconfidential, may be attorney-client privileged, ma=\nconstitute inside information, and is intended only for\nthe use of=he addressee. It is the property of\nJEE\nUnauthorized use, disclosure=or copying of this\ncommunication or any part thereof is strictly prohib=ted\nand may be unlawful. If you have received this\ncommunication in =rror, please notify us immediately by\nreturn e-mail or by e-mail to jeevacation@gmail.c=m, and\ndestroy this communication and all copies thereof,\ninclud=ng all attachments. copyright -all rights reserved\n2\nEFTA_R1_01625955\nEFTA02499531\n", "char_count": 2005}]}