{"efta_number": "EFTA02498267", "page_count": 1, "url": "https://epstein-data.com/EFTA02498267", "pdf_url": "https://epstein-data.com/pdf/EFTA02498267.pdf", "pages": [{"efta_number": "EFTA02498267", "page_number": 0, "text_content": "From:\nSent:\nTo:\nCc:\nSubject:\nDaphne Wallace\nFriday, June 19, 2015 1:44 PM\nJeffrey Epstein\nann rodriquez; Rich Kahn\nBarge return June 19, 2015\nGreetings Sir,\nThe realistic date for t-e return of Big N is Friday, July 31.\nWe spoke wi=h Gene this morning (Gene spoke with Boscoe last night) who summarized for us the parts to be\ncompleted before the barge is ready for sea trials:\nOld engines removed and stored\nEngine parts-swapped from old engines to new ones New engines set in place (old engines loaded for return) Alignment\nExhaust s=stem Wiring to the new engines Recondition the transmision Replace the fuel lines Recondition the\nfuel filters Sea trials\nGene does not forese any catastrophic setbacks, but at this time he also does not see the competion before the end\nof July.\nWhen we speak with =oyson on Monday, I will request their barge for the mobilization of Better-Roads equipment, and\nthat they work with us as auxiliary until Big N's-return, so this project's schedule is not derailed.\nRespectfully, Daphne\n<J=>\nEFTA_R1_01623579\nEFTA02498267\n", "char_count": 1056}]}