{"efta_number": "EFTA02488882", "page_count": 1, "url": "https://epstein-data.com/EFTA02488882", "pdf_url": "https://epstein-data.com/pdf/EFTA02488882.pdf", "pages": [{"efta_number": "EFTA02488882", "page_number": 0, "text_content": "From:\nSent:\nTo:\nCc:\nSubject:\nDaphne Wallace <\nWednesday, September 9, 2015 4:13 PM\nJeffrey Epstein\nann rodriquez; Rich Kahn\nBoyson schedule - September 9, 2015\nGreetings Sir,\nAnna and I just received a phone call from Boyson. The parts they are waiting on to repair th=ir second engine will not\nbe available until next week.\nAs a result, they can only transport lighter loads. Anna-has prioritized getting the trash, gravel, sand, topsoil and waste\noil rem-val completed as soon as possible.\nBoyson cannot =arry the weight of the crusher run volume that is needed to complete the R-ad project, nor the asphalt,\nuntil both engines are back online.\nTo make matters worse, they are scheduled to put the arge into drydock beginning 9/18 for approximately 10 days.\n=/div>\nWe will concentrate on maximizing the crucial loads needed to ke=p the present projects going and prepare for your\nreturn, and next week si= with Mr. Jeffers and Big Sam to create a new Road Schedule for your revie=.\nRespectfully, Daphne\nEFTA_R1_01609128\nEFTA02488882\n", "char_count": 1035}]}