{"efta_number": "EFTA02487129", "page_count": 2, "url": "https://epstein-data.com/EFTA02487129", "pdf_url": "https://epstein-data.com/pdf/EFTA02487129.pdf", "pages": [{"efta_number": "EFTA02487129", "page_number": 0, "text_content": "From:\nSent:\nTo:\nSubject:\nRichard Kahn\nSaturday, September 26, 2015 8:23 PM\nJeffrey Epstein\nFW: lighting system status\nFrom: Alfred Buonanno\nDate: Saturday, September 26, 2015 at 3:24 PM\nTo: Richard Kahn\nSubject: RE: lighting system status\n=meta name=\"Generator\" content=\"Microsoft Word 15 (filtered medium)\">\nAs stated in punch list the antique brass plates require custom sizin which could not be determined until all keypads\nwere install. Keypad= could not be installed until wiring was identified and tested. All of these items take time and as\nsuch were not completed until this week du= to the extensive delays. Note this is just for the antique brass pla=es.\nKeypad engravings have been order and should arrive this week.\n&nb=p;\nFrom: Richard Kah=|\nSent: Saturday, September 26, 2015 3:15 PM\nTo: Al B=onanno<\nSubject: Re: lighting system status\n<= class=\"MsoNormal\">\nPlease admise why plates are just being ordered now as we ordered them months ago. Thank you.\nSent from my iPhone\nOn Sep 26, 2015, at 2:39 PM, Al Buonanno\nHello-Richard and Merwin,\nwrote:\nAs you know the lighting system is not completed. While much of the lighting is fully functional there are a few\nlocations t-at are not. The troublesome locations are the dimmed/switched outlets- These locations had specialty\nwiring that will need further work from the electricians. Please note that -e have been assisting them as much as\npossible.\nEFTA_R1_01606462\nEFTA02487129\n", "char_count": 1441}, {"efta_number": "EFTA02487129", "page_number": 1, "text_content": "As you are both aware the =tarts and stops have added a lot of time to the project. I am confident that one\nmore strong push after Mr. Epstein departs on October the 5-h and we will be in good shape.\n&n=sp;\nPunch List:\ncommands)\n&nbsp; Troubleshoot all outlets and correct RPM wiring=as required.\nDouble check all load identification for accura-e documentation for the as build system design.\n=nbsp; Install all engravings on keypads. (most should-arrive this week)\nFinalize additional customized keypads with spe=ialty functions. (these are keypads with house wide\n&nbs; Order and install all customized antique plates= (note: all keypads needed to be installed for\nproper custom dimensio=s. Measurements were performed on Friday and plates will be ordered o= Monday. 2-3 week\nlead time.\nPleas= contact me with any questions, comments, or concerns.\nRegards,=/p>\nΑΙ\n</=:p>\nAlfred Buonanno\nClarity Custom =nc.\n1792 West 11th Street\nBrooklyn NY 11223\n2\nEFTA_R1_01606463\nEFTA02487130\n", "char_count": 981}]}