{"efta_number": "EFTA02471505", "page_count": 3, "url": "https://epstein-data.com/EFTA02471505", "pdf_url": "https://epstein-data.com/pdf/EFTA02471505.pdf", "pages": [{"efta_number": "EFTA02471505", "page_number": 0, "text_content": "From:\nSent:\nTo:\nSubject:\njeffrey E. <jeevacation@gmail.com>\nWednesday, February 24, 2016 9:31 AM\nRichard Kahn\nRe: El Brillo Way Sea Wall Bids\nlets talk on mon. how long does the repair take? =AO we should do it when the windows are getting installed.\nOn Wed, Feb 24, 2016 at 12:22 AM, Richard Kahn\nwrot=:\nArra=\nat ached are both bids:\noriginal from Dan 29,800 and new bid fro= Brian 64,915\nbelow Brian explains the difference between both bids\nplease advise\nthank-ou\nRichard Kahn\nHBRK Associates Inc.\nNew York, NY 10022\nBegin forwarded message:\n<=iv style=\"margin-top:0px;margin-right:0px;margin-bottom:0px;margin-left:=px\">From: Brian\n<mailto:\nSubject: El Brillo Way Sea Wall Bids<=r>\nDate: February 23, 2016 at 4:47:07 PM EST\nTo: Richard Kahn\nn<=a>>\nRich,\nI looked at both bids closely. I =id a quick sketch to help (I hope) visualize whats going on with the sea\nw=ll and what both Contractors are proposing.\n1\nEFTA_R1_01583085\nEFTA02471505\n", "char_count": 943}, {"efta_number": "EFTA02471505", "page_number": 1, "text_content": "The First part of both bids are relatively the same. Remove old sheet piling, pound new sheet piling i-to\nthe lake floor a few inches out from the old concrete and pour new conc=ete. This is meant to help hold back the base of\nexisting sea wall.\nThi= step will help hold and buy some time, and I would say that both contract=rs would be in the\n$30,000.00 range to complete this job.\nStep 2. This is where Pilings Plus would drill 29 manta rays approximately every 5-foot along the sea\nwall on an angle down to further reinforce he sea wall. I've enclosed a youtube video link, so you can\nunderstand what a manta ray is and does.\nStep 3. Drill 18 weep holes approximately-every 8 foot along the sea wall with well points to allow\nwater to drain out but not the soil.\n=C2�As the tide rises the water from the lake actually flows =ehind the sea wall and the water in\nthe ground will rise with the tides. W=en the tide goes out the water is trapped behind the sea wall causing hydr-static\npressure trying to get out. The weep holes allow it to go out reduc-ng hydrostatic pressure.\nrepair=\nConclusion: Labontes bid or just ins-alling the new sheet piling and concrete is a one step approach for\n=AO\nPilings Plus-has a multi or 3 step approach for repair that addresses 3 separate issues=\nand of course is more costly but likely a more permanent repair.\n<mailto:\nI hop=this helps\nThanks,\nBrian\nhttps://youtu.be/Rtq-YFgUQ60 <https://youtu.be/Rtq-YFg=Q60>\nFrom: David Newm=rk <pil-ngsplusdavid@yahoo.com\nDate: February 23, 2016 at 9=57:35 AM EST\nTo: \"\n<mailto\n<David:\n954.520.5770 <tel:954.520.5770>\n<=div>\nFax: 561.241.5367 <tel:561.241.5367>\nE-mai=:\nWebsite: www.floridapilings.co=\n2\n<mailto\nEFTA_R1_01583086\nEFTA02471506\n", "char_count": 1717}, {"efta_number": "EFTA02471505", "page_number": 2, "text_content": "please note\nThe info=mation contained in this communication is\nconfidential, may be attorney-client privileged, may\nconstitute inside information, and is intended o=ly for\nthe use of the addressee. It is the property of\nJEE\nUnauth=rized use, disclosure or copying of this\ncommunication or any part ther=of is strictly prohibited\nand may be unlawful. If you have received thi=\ncommunication in error, please notify us immediately by\nreturn e-mail or by e-mail to jeevacation@gmail.com <mailto:jeevacation@gmail.com>, and\ndestroy this communication and all cop=es thereof,\nincluding all attachments. copyright -all rights reserved\n3\nEFTA_R1_01583087\nEFTA02471507\n", "char_count": 661}]}