{"efta_number": "EFTA02468676", "page_count": 3, "url": "https://epstein-data.com/EFTA02468676", "pdf_url": "https://epstein-data.com/pdf/EFTA02468676.pdf", "pages": [{"efta_number": "EFTA02468676", "page_number": 0, "text_content": "From:\nSent:\nTo:\nSubject:\nhes nuts,\njeffrey E. <jeevacation@gmail.com>\nFriday, March 18, 2016 8:25 PM\nErika Kellerhals\nRe: Great St. James\n<=iv class=\"gmail_quote\">On Fri, Mar 18, 2016 at 4:23 PM, Erika Kellerhals=<Cell\nNotice: This communicat-on may contain privileged or other confidential information. If you are not the intended\nrecipient, or believe that you have received this comm-nication in error, please do not print, copy, re-transmit,\ndisseminate, or otherwise use this information. Also, please indicate to the sender =hat you have received this e-mail in\nerror, and delete the copy you receiv=d. Thank you.\nCircular 230: To ensure c=mpliance with the requirements imposed by the IRS, we inform you that any =ax advice\ncontained in our communication (including any attachments) was not intended or written to be used, and cannot be\nused, for the purpose of (=) avoiding any tax penalty or (ii) promoting, marketing or recommending to another party\nany transaction or matter addressed herein.\nForwarded message\nF-om: Ryan Wisehart <=\nDate: Fri, Mar 18, 2016 at 3:43 PM\nSubject: Fwd: Great St. James\nTo: Erika Kellerhals\nC=: Richard Kahn <ri\nErika,\nFor your convenience I'm attaching the original proposal and budget documents provided to Daphne, then forwarded by\nher-to Rich. The following narrative should help fill-in the gaps which I probably didn't communicated well via the\nproposal.\n<=r>Our Scope-of-Work as conceived includes Road Design and Development and -opographic Surveying, as follows:\n1. Develop conceptual road la-out plan (Delivered). The purpose of this exercise is to determin= feasible and\npreferable routes for accessing the island promontories. The owner desires gentler routes than those developed on\nLittle St. James. Wit= that in mind we used existing aerial terrain mapping to develop routes that should have gradients\n1\nEFTA_R1_01578499\nEFTA02468676\n", "char_count": 1889}, {"efta_number": "EFTA02468676", "page_number": 1, "text_content": "of about 10% or less. Routes were also determined =hat will facilitate future water and helicopter points of access. At\nth=s point I need the owner's feedback before proceeding to a more detail=d engineering plan. Does the owner want\nmore or fewer roads, access to other locations, etc? We'll incorporate owner feedback into a revised =oncept and\nproceed to developing permit plans.\n2. Prepare plans fo= permitting including earth-change and erosion/sedimentation control.=C2�Upon owner\napproval of the conceptual road layout plan we will develo= specific plans for supporting permit applications with CZM.\nThese plans w=ll include specifications for the roadways including typical road section =road foundation), existing and\nproposed road profile elevations (grades), =rosion and sedimentation controls and best practices.\n3. Field sta=ing of roadways and erosion control measures. Field staking of th= roadways will provide accurate\nassessment of routes through actual, direc= ground measurement. Adjustments in road locations will be made at this\nti-e to avoid terrain that is too steep, highly erodible, and to facilitate p=eservation of desirable natural features (i.e.\nrock formations, special tr=es, etc.) The staking will also allow investigations by Bioimpact.\n4. Topographic surveys of various areas including the existing main house and new dock area. Basically, general\non-call services as request=d. There was previously mention of surveying the main house area but I'm not aware if this\nis needed or not. Also, Amy mentioned needing an as-bu-lt survey of the dock. I'm not sure if the information we\npresently have for the dock is sufficient for her purposes.\nMoving forwar= it is advisable that we have a coordination meeting with Amy and any othe= persons working on the\nproject (is there an archeologist on board, archit=ct, etc.?) Also, who will be preparing the actual permit application and\na=pearing for public hearings, if any are needed?\nF=nally, please let me know if Mr. Epstein has comments about the road conce=t and if we should proceed with\ndeveloping permit plans.\n=div dir=\"ltr\">\nSincerely,\nRyan C. Wise-art, PLS\nPresident\nBRIAN MOSELEY & ASSOCIATES, INC.\n4003 Raphune Hill Road Suite #606 St. Th=mas. VI 00802\nForwarded message\nF=om: Ryan Wisehart <a href=\"\nDate: Thu, Feb 4, 2016 at 11:26 AM\nSubje=t: Great St. James\nTo: Daphne Wallace\nCc: Erika Kell-rhals<\nGood morning Daphn=,\nAttached is our proposal, budget, and hourly rates. P-ease sign and return the proposal indicating acceptance and I will\nforward an invoice for mobilization. Please be sure to give me a call with any que-tions.\nSincerel=,\n2\nEFTA_R1_01578500\nEFTA02468677\n", "char_count": 2667}, {"efta_number": "EFTA02468676", "page_number": 2, "text_content": "Ryan C. Wisehart, PLS\nPresident\nBRIAN MOSELEY & ASSOCIATES, INC.\n4003 Raphune Hill Road =uite #606 St. Thomas, VI 00802\nplease =ote\nThe information contained in this communication is\nconfidencial, may be attorney-client privileged, may\nconstitute inside information, and is intended only for\nthe use of the addressee. It is the propert= of\nJEE\nUnauthorized use, disclosure or copying of this\ncommunica=ion or any part thereof is strictly prohibited\nand may be unlawful. If =ou have received this\ncommunication in error, please notify us immediat=ly by\nreturn e-mail or by e-mail to jeevacation@gmail.com <mailto:jeevacation@gmail=com>, and\ndestroy this comm=nication and all copies thereof,\nincluding all attachments. copyright --ll rights reserved\n3\nEFTA_R1_01578501\nEFTA02468678\n", "char_count": 781}]}