{"efta_number": "EFTA02457015", "page_count": 2, "url": "https://epstein-data.com/EFTA02457015", "pdf_url": "https://epstein-data.com/pdf/EFTA02457015.pdf", "pages": [{"efta_number": "EFTA02457015", "page_number": 0, "text_content": "From:\nSent:\nTo:\nSubject:\nDavid Mitchell\nSaturday, April 28, 2018 6:28 PM\njeffrey E.\nLast week report on third party inspection tco\nWe had 17 locations :items that needed GRANT the third party inspector to sign off on</=pan>\n4 remaining =laces they could not get to physically this week they have agreed to let t-e design project professionals\ngive them affidavits that the respective ar=as are compliant\nWe have item-5 already\nAnd items 6 =s for Monday by Grant\nThe professi=nals have all been contacted and have agreed to address the list below by =nd of day Tuesday\nI would assume a one day margin of error so say Wednesday\nPlease see te below sign offs needed for Grant to complete the TR1 forms, which will b= the remaining paperwork to\nobtain TCO for 19 West 31 Street. Grant has requested the below in order to complete the=TR1 forms:\n1. Struct=ral - the walls/ceilings closed up, not possible for an inspectio=; therefore, need the structural engineer to sign\noff on all nonconfo=mities. The structural engineer needs to approve work completed.\n2. S-rinkler system - no submittals on site / The MEP engine=r needs to sign off on the installed sprinkler heads and\nconfirm the insta-led sprinkler heads were per the submittals.\n3. M=sonry anchors - the walls/ceilings closed up, not possible=for an inspection; therefore, need the structural\nengineer to approve the SOP conditions and if possible, have the GC provide photos and info on installation.\n4. F=nestration - need an email confirmation from architect stating&nb=p;that the U-factor, R values, and insulation of\nfield work conforms to sp=cifications.\n5. F=re protection - need the DOB / FDNY sign offs from Metropoli=/ACP Electrical.\n1\nEFTA_R1_01560555\nEFTA02457015\n", "char_count": 1730}, {"efta_number": "EFTA02457015", "page_number": 1, "text_content": "6. M=chanical - then one last item, Grant inspector needs to do the fi-al Mechanical inspection.\nDAVID MITCHELL\nMitchell Holdings LLC\n745 Fifth Avenue\nNew York NY 10151\nUSA\n</=> <mailto:\nOn Apr 28, 2018, at 1:37 PM, jeffrey E. <jeevacation@gmail.com <mailto\n?\n> > wrote:\nplease note\nThe information contained in this communication is\nconfidential, may be attorney-client privileged, may\nconstitute inside information, and is intended only for\nthe use of the addressee. It is the property of\nJEE\nUnauthorized use, disclosure or copying of this\ncommunication or any part thereof is strictly prohibited\nand may be unlawful. If you have received this\ncommunication in error, please notify us immediately by\nreturn e-mail or by e-mail to jeevacation@gmail.com <mailto:jeevacation@gmail.com>, and\ndestroy this communication and all copies thereof,\nincluding all attachments. copyright -all rights reserved\n2\nEFTA_R1_01560556\nEFTA02457016\n", "char_count": 932}]}