{"efta_number": "EFTA02443246", "page_count": 3, "url": "https://epstein-data.com/EFTA02443246", "pdf_url": "https://epstein-data.com/pdf/EFTA02443246.pdf", "pages": [{"efta_number": "EFTA02443246", "page_number": 0, "text_content": "To:\nCC:\nFrom:\nSent:\nDoug Schoettle\nJ Epstein[jeevacation@gmail.com]; Darren Indykel\nBrice Gordon\nSat 5/30/2009 10:01:44 AM\nSubject: Re: LSJ Bath addition and mechanical building budget and designs\nTitle: Re: LSJ Bath addition and mechanical building budget and designs\nMy comments and recommendations Below\nOn 5/29/09 4:01 PM, \"daschoettle@yahoo.com\" <daschoettle@yahoo.com> wrote:\nDarren, I have reviewed the documents you sent me, I don't understand the budget\nnumbers, most seem to be high. The following is a basic break down of the square\nfootage of the various components of the master bath addition.\nAddition to bathroom\naddition to verandah\n680 sq.ft.\n355 sq.ft.\nExisting bathroom remodeled\n330 sq.ft.\nExisting bedroom and entry\n635 sq.ft.\nExisting verandah\n755 sq.ft.\n2755 sq.ft.\nTotal under roof\nThe proposed scope is incomplete and undefined. I don't understand most of the budget\ndollars. This is a simple addition to a simple building in the USVI, the exterior\nmatches the existing, the interior may have fancy marble but thats just a finish. This\ncannot be a million dollar project. Agree not a million dollar project, exterior material\nis the same but the look is different, i.e. stone veneer columns and no arches to\nmatch office pavilion.\nWith regard to the Mechanical Building fit out and possible extension, I do not have a real\nplan or specification upon which to base my review, just a stick drawing without\nengineering. At the same point as a year ago.\n1. The existing, approved CZM drawings indicate a location for fuel truck delivery that\ncomplies with DPNR. Why change the location? Doug, we discussed this situation\nand you agreed to proposed location change. The existing approved site, as you\nexplained to me is where the construction trailer, a container, toilet trailer are\npresently located. Darren, I believe we need to show compliance (DPNR) in regard to\nfuel truck storage and waste oil containment within the very near future, not 3 plus\nyears later when construction has been completed, hence the need to change\nlocation.\n2. Why construct expensive retaining walls? The lower level of the electrical building is to be\ncompletely backfilled and the fill is to extend toward the water for some distance\nbefore it slopes down to meet existing grade. The island has no shortage of\nexcavated fill to get rid of or to be repositioned. Doug how do you propose to back fill\nbetween Aarons workshop and the new Mechanical building to grade, when the wall\nthat supports the metal structure of Aaron's workshop has not been designed as a\nretaining wall. Excavated Fill -1/3 road material, 1/3 landscape/rock walls, 1/3 fill, a\nrough estimate, there maybe just enough fill. That is also taking into account the\nproposed excavation for the Gensler theater which will also require back filling and\nfinal grade to bury it.\n3. A new cistern at the mechanical area should take into account the proposed additions to\nEFTA_R1_01518564\nEFTA02443246\n", "char_count": 2965}, {"efta_number": "EFTA02443246", "page_number": 1, "text_content": "the existing house. The addition will require a large cistern which is better located\naway from the additions and gardens, preferably at the mechanical area. Agree\n4. The fire supression system will require a fire reserve storage of water. If a large cistern\nhas not been constructed in time then temporary plastic storage tanks can be used.\nThe temporary tanks should be placed outside the building in the landscape above\nthe building. The lower level of the building is constructed to hold fuel tanks and to\ncontain any oil leaks. No drains are permitted. Water tanks should not be located at\nthis level. Disagree, Water proofing and a thing called a sump pump with alarm,\nObliviously it needs to meet with code/engineering approval.\n5. The budget estimate seems expensive to extend the mechanical building by such a small\namount, perhaps an extension twice the size would be more economical and useful.\nUseful yes, economic ? More excavation, forming, rebar, concrete and engineering\n6. Another consideration should be to construct a large concrete cistern tank seperatly from\nthe electrical building and put a metal structure on top. Consider modular RO units in\ncontainers similer to the existing unit. Agree with 2 RO units, no to containers. Skid\nmounted RO's and pre treatment need to be properly mounted, pumps and\ncontrollers need to be cooled, otherwise premature failures will occur.\n7. If alternate sources of energy are to be considered the engineering of the electrical fit out\nwill need to be reengineered.\nRegards, Douglas\n1. NEWMAN AND MOLL ARE DEMOBLIZING NEXT WEEK\n2. GLIDDEN NEEDS DIRECTION FOR FINAL GRADE FOR TRANSFORMER AND\nCONDUIT PLACEMENT\nTAKING INTO ACCOUNT PRESENT AND FUTURE BUILD OUT, SUPPORT NEEDS i.e. storage,\npower/water and ECOMONIC'S, I WOULD RECOMMEND THE FOLLOWING.\nNO TO: EXTENISION\nYES TO: 2 GENERATORS, FUEL TANKS, SWITCHING GEAR.\nRO'S IN EXISTING STRUCTURE WITH POLY TANKS FOR FIRE SUPPRESSION IF CODE\nALLOWS.\nRETAINING WALLS FORMED, NEW METAL STRUCTURE TO HOUSE ENGINEERING AND\nSTORAGE CONTAINERS.\nPOLY TANKS ADJACENT TO MECHANICAL STRUCTURE AS CISTERNS (DECREASED AND\nADDED AS REQUIRED)\nBACK FILL AND TERRACE AREA PARALLEL WITH HELIPAD.\nOBIVIOUSLY BUDGETS AND ENGINEERING NEED REVIEW.\nDOUG HOW WOULD YOU PROCEED\nBrice M Gordon\nEFTA_R1_01518565\nEFTA02443247\n", "char_count": 2302}, {"efta_number": "EFTA02443246", "page_number": 2, "text_content": "EFTA_R1_01518566\nEFTA02443248\n", "char_count": 30}]}