{"efta_number": "EFTA02442967", "page_count": 1, "url": "https://epstein-data.com/EFTA02442967", "pdf_url": "https://epstein-data.com/pdf/EFTA02442967.pdf", "pages": [{"efta_number": "EFTA02442967", "page_number": 0, "text_content": "J Epstein[jeevacation@gmail.com\nDarren Indyke\nTo:\nCC:\nFrom:\nBrice Gordon\nSent:\nThur 5/28/2009 9:45:41 AM\nSubject: Mechanical Building, retaining walls\nTo: JEE\nContacted Tom Melnick in regard to the retaining walls for the Mechanical\nBuilding. His recommendation is to do the Following.\n1. form pad and retaining walls between existing engineering and new mechanical\nbuilding, this area would be use for fuel truck storage etc.\nPlease note original plans had an access road, and existing engineering removed.\nThe above would give you the option to refurbish engineering structure later.\n2. If you do not intend to extend Mechanical building for new RO and cistern,\nthen another retaining wall will need to constructed to retain fill and also to\ngive access to roof area for boat trailer storage etc.\nYour last indication to extending the building was, \"probably\"\nNotes:\nTom needs a decision by Friday, as to which direction you wish to proceed and to\nkeep on schedule.\nNewman and Moll will demobilize by the end of next week, i.e. all forms,\ncontainers of equipment will be removed from the Island\nWould recommend that Tom views budget on this, once direction is given.\nPlease advise\nBrice\nEFTA_R1_01518180\nEFTA02442967\n", "char_count": 1219}]}