{"efta_number": "EFTA02439009", "page_count": 1, "url": "https://epstein-data.com/EFTA02439009", "pdf_url": "https://epstein-data.com/pdf/EFTA02439009.pdf", "pages": [{"efta_number": "EFTA02439009", "page_number": 0, "text_content": "To:\nFrom:\nSent:\njeevacation@gmail.com[jeevacation@gmail.com]\nSun 10/25/2009 2:46:05 PM\nSubject: Re: (no subject)\nNon cooperative would be an understatement!,,,I started coming down with the FLU on Friday,,,ask Igor how I\nyelled at Eric Glaser when I saw the boat! I lost my voice later..\nÍ now realize why they never called to have me come down during the completion, they just slapped the boat\ntogether, a lot of unfinished areas, plus options I requested that where not included.\nI have to wait till Monday, so Darren can fwd me the original final contract, my notes have two items that where\nnot installed, and I know we requested them, One is the RADAR, and two is the stainless steel Boarding\nladder,,the ladder was important, if some one falls off the boat, they would not be able to get back in..\nEFTA_R1_01512621\nEFTA02439009\n", "char_count": 834}]}