{"efta_number": "EFTA02436090", "page_count": 3, "url": "https://epstein-data.com/EFTA02436090", "pdf_url": "https://epstein-data.com/pdf/EFTA02436090.pdf", "pages": [{"efta_number": "EFTA02436090", "page_number": 0, "text_content": "To:\nFrom:\nSent:\nJeffrey Epstein[jeevacation@gmail.com]\nWed 11/18/2009 8:50:28 PM\nSubject: LSJ\nThis project is a combination of owners design team and project design\nmanagement.\nPROJECT SCOPE\n- The development of a total design program\n-Analysis of all project building phases with anticipated client on island\nexpectations.\n-\n- Acting as an information conduit between client and on site construction\nmanagement Develop and clean up existing plans, create detailed int des\ndocuments, perform decorating services that are coordinated with design documents.\nPROJECTS\nPROJECT A\nLaundry, Master Suite and Library\nReview all drawings and develop a finish schedule\nCreate specs for all areas: we use a software called Spexx which will be a\ncomplete record for every item be it a arch finish or FFE item. (An example of\nthis deliverable will be sent to you)\nThis is used on the site as well as for purchasing.\nDecor will be presented (if you have this done then it can be reviewed and\nmanage)\nPROJECT B\nMain Pool and Great room compound to include porches, added bungalows and walk\nways\nReview existing plans and design program and set out to reevaluate these plans\nand make changes where needed\nDevelop a DD set that includes these new ideas\nInterior finishes and fixture program will be defined\nCD set started so as to define a budget.\nManufacturing will be vetted and sample phase will begin\nDecor will be presented and a budget developed\nSATELLITE PROJECT\nOther structures on island will be redesigned\nCanter levered pavilion will be designed.\nThe kite pavilion will redesigned\nTennis court and pavilion redesigned\nPlus others\nPower requirements need to be thought through and incorporated into new power\ngrid. Solar and or Wind powered generators is an option\n(There needs to be an overall design language developed so all details become\nEFTA_R1_01508425\nEFTA02436090\n", "char_count": 1866}, {"efta_number": "EFTA02436090", "page_number": 1, "text_content": "unified and systemized so as to streamline construction means and methods which\nin turn will drive budgets down)\nPLATAUGH PROJECT\nDevelop location and axis\nA Vision needs to be developed\nPower requirements need to be thought through and incorporated into power overall\npower program\nIs this a potential place for invited people to come too for isolated thinking\n-is this a place to have an international forum\n-is this a simple place for the client\n-is this an art installation (Inash Kampour (spelling?)...on and on\nPHASING\nThis is a collaborative endevour and is directly liked to the difficult Island\nof St Thomas dept of Buildings and it's bureaucracy.\nWe will develop this with the Construction team\nOnce this is in place we will plug in the design phases\nBecause of this all projects mentioned above will be done parallel to each other\nProject A is immediate and needs to be ready for June 2010\nProject B needs to start construction with full budgets in place by May 2010\n(Contractor will file existing plans so as to obtain approval to be amended\nlater)\nPROJECT TEAM\nTHIS IS A PROMISE:\nI will dedicate myself to this project and oversee all design aspects: help\nclient through existing issues on Project A and then oversee design on the other\nprojects.\nSelection of all finishes, equipment, lighting and furnishings will be my\nresponsibility.\nArchitectural\nTEAM I\nJorge Porta: project leader for zeffdesign on Hard Rock ..coordinated all aspects\nincluding construction management and coordination of all parties ...been with me\nfor 10 years...a detail giant (sending his drawings with package)\nCorey Chapman: assistant draftsman. Has been Jorge s assistant for two years\nTeam II\nJavier Rodriguez or Sarah Lutalah\nTeam leaders on big residential and hotel projects.\nDECOR and FFE TEAM (let's get a fresh team for you)\nStacy Meador and Donna Lee:\nThese two did the FFE for new tower at Hard Rock which was over 1 mm squ ft of\nnew build in 18 months...they are so proficient that the development team at HRH\nwanted them full time\nI can provide references on all these people.\nDEDICATED TIME\nEFTA_R1_01508426\nEFTA02436091\n", "char_count": 2125}, {"efta_number": "EFTA02436090", "page_number": 2, "text_content": "The arch TEAM I and the DECOR TEAM I\nWe can start with these two teams and when needed bring on the 2nd team for Arch\nonce Satellite and Plateau projects start.\nAs I said I will be doing this project full time...4 hours per day minimum plus\non site.\nthe design team will be dedicated resources full time ... Jorge will partner with\nSarah or Javier as we get into more Projects.\nEach project will have a leader once they get into the DD and CD phases.\nON SITE\nOnce Garry and I figure out the project phasing and critical path timetable the\non site presence will be a weekly or even full time program based on project\nneeds....Dedicated.\nI will be on site as often as is required...every 10 days, whatever it takes.\nOn site is a bell curve that we know how to manage well.\nEFTA_R1_01508427\nEFTA02436092\n", "char_count": 801}]}