{"efta_number": "EFTA02425620", "page_count": 2, "url": "https://epstein-data.com/EFTA02425620", "pdf_url": "https://epstein-data.com/pdf/EFTA02425620.pdf", "pages": [{"efta_number": "EFTA02425620", "page_number": 0, "text_content": "To:\nCC:\nFrom:\nSent:\nJeffrey Epstein[jeevacation@gmail.com]\nGary Kerney\nFri 5/7/2010 7:17:27 PM\nSubject: minutes of 5/6'10\nAgenda visit 5/6/10 WITH MINUTES 5/7/10\nMaster suite\n1. Shower/steam design\nRECIEVED FINAL PLANS\n2. white tassos in steam/shower\na.white glass in dressing room\ncost $55,000 5 months lead time plus install and shop drawing time\nb. Tassos in dressing room\ncost $ 30,000 2 months delivered and installed\nSEE 1\n3.tub and room design\nDESIGN PENDING\n4.arch openings between bed and bath\nKEEP\n5.wood flooring design, coral gone on dressing room floor\nSEE 1\n6.treatment of bedroom walls\nPLASTER THEN ROBERT WILL DECIDE ON FINAL\n7.door review?\nROBERT TO FORWARD PLAN MAY CLOSE OFF DOORS ON WEST\n8.tv location\nSEE 8\nLibrary\ncourtyard design\nGAVE ROBERT AS BUILTS AND REVIEWED ALTERNATIVE MATERIALS TO MAKE DESIGNS\nKitchen\nEFTA_R1_01494020\nEFTA02425620\n", "char_count": 864}, {"efta_number": "EFTA02425620", "page_number": 1, "text_content": "1.interior design\nSENT CAD DRAWINGS TO ABRAM, AND WENT OVER FUNCTION WITH BRICE, ROBERT TO\nPRODUCE DESIGN DRAWINGS\n2.COLUMN DECISION\nROBERT TO DO TWO OR THREE ALTERNATIVES IN PHOTO SHOP GARY TO PRICE\n1 KEEP ARCHES WITH PLASTER COLUMNS\n2 KEEP ARCHES WITH PLASTER COLUMNS AND STONE BASE\n3 REMOVE ARCHES AND NEW STONE COLUMNS\nCottages\n1. Door approval\nDONE\n2. Shower decision\na.fully enclosed stone and tiled, seems to tight to me\nb.collum plus roof and screen seems right\nROBERT TO SKETCH UP PLAN,GARY TO PRICE\n3.Abram gave us direction on elect. how about TV?data ect.\n4.design for vanities to replace pedestal sinks and any change to bath rooms(currently none in\nbudget)\nROBERT TO FORWARD PLAN/SPEC\nSite\n1.review wall progress\n2.Get everyone thinking about walk from kitchen to master to library\nWE REVIEWED THE SKETCHES AND ROBERT TO REFINE PLAN\nGensler\nWE REVIEWED ROBERTS PLAN FOR THE THEATER/POOL AND HE WILL REVISE AND\nFORWARD TO ME TO STAKE OUT\nCZM Dejongh\nJeffrey last time we didn't get to tiki, pool pavilion, kite house, entry, plaza, theater and indoor pool\nwith Robert and you together\nEFTA_R1_01494021\nEFTA02425621\n", "char_count": 1128}]}