{"efta_number": "EFTA02421220", "page_count": 1, "url": "https://epstein-data.com/EFTA02421220", "pdf_url": "https://epstein-data.com/pdf/EFTA02421220.pdf", "pages": [{"efta_number": "EFTA02421220", "page_number": 0, "text_content": "To:\njeevacation@gmail.com[jeevacation@gmail.com]\nFrom:\nSent:\nMon 9/13/2010 7:08:11 AM\nSubject: GIIB maintenance\nJeffrey,\nI used the toasted for several minuets no faults noticed, all was operating correctly.\nI have the Gulfstream being worked on at Meridian at Teterboro, the APU flamed out two times recently for no\napparent reason, I heard a hissing sound from the exhaust before the APU flamed out, I suspect the fuel nozzle\nbeing plugged and not spraying a good pattern, which is necessary for jet fuel to burn under the high pressure.\nplus small interior cosmetic items and avionic items I would like repaired,\nLet me know if the schedule changes and when you think you will be ready to fly the Gulstream, I told them to\nhave plane ready by Friday afternoon at the latest. I will keep you updated.\nthank you,\nLarry\nEFTA_R1_01487402\nEFTA02421220\n", "char_count": 850}]}