{"efta_number": "EFTA02420417", "page_count": 1, "url": "https://epstein-data.com/EFTA02420417", "pdf_url": "https://epstein-data.com/pdf/EFTA02420417.pdf", "pages": [{"efta_number": "EFTA02420417", "page_number": 0, "text_content": "To:\njeevacation@gmail.com[jeevacation@gmail.com]\nFrom:\nSent:\nTue 10/5/2010 4:54:23 PM\nSubject: Gll maintenance plan\nRich,\nLarry Morriosn and myself have selected Midcoast Aviation in St. Luis to complete the Gulfstream inspection\nstarting November 1st, 2010.\nMidcoast in owned by General Dynamics. This facility has strong Gll mechanics on staff.\nHighlights of Pricing:\nOps inspection $87,686.00 which includes interior removal and installation. ($7,000 value).\nfuel credit of $5,000.00 at delivery.\nreduced hourly labor rate from $107.00 per hour to $92.00 for discrepancy repairs found.\n15 to 19 working day down time is estimated.\npayment schedule is 50% due at contract signing, and 50% of contract price at delivery, remaining balance of\nsquawks / repairs will be 30 day net.\nsimple estimate for completed price, double the inspection price, I estimate total inspection to be in\nthe neighborhood of $175,372.00 to $200k depends on corrosion found during inspection, which could add to\ndown time.\nWe received bids from:\n\"Private Sky\" in Ft, Myers Fl, $87K (time and material for interior removal in installation.)\n\"General Dynamics\" in PBI, $123K labor rate $110.00 per hour.\n\"Eastway Maintenance\" in Islip, NY, $94K labor rate $95.00\n\"Chrysler Pennastar\" in Pontiac MI, $97K labor rate $97.00\n\"Executive Jet Services\" in Fort Lauderdale Fl. $72K (small un-known).\nthank you,\nLarry\nEFTA_R1_01486328\nEFTA02420417\n", "char_count": 1416}]}