{"efta_number": "EFTA02415516", "page_count": 3, "url": "https://epstein-data.com/EFTA02415516", "pdf_url": "https://epstein-data.com/pdf/EFTA02415516.pdf", "pages": [{"efta_number": "EFTA02415516", "page_number": 0, "text_content": "To:\nJeffrey Epstein[jeevacation@gmail.com]\nEmad Hanna\nThur 11/4/2010 1:27:07 PM\nFrom:\nSent:\nSubject:\nRE: LSJ: Big N\nJeffrey,\nI have done some research on this and here is what I have found.\nWhen we purchased the barge in 2007 we installed a new Hydraulics system costing about $ 53,000. The\nrust on the cylinders has caused the seal to break therefore these repairs must be done and these\nestimates are not 100% solid and the cost could change we won't know until its taken apart and from\nspeaking to Bill Rowles and Boscoe these estimates do not seem out of line for the work that will be\ndone. Also from speaking to them if we had some kind of a regularly scheduled maintenance programs\nwhere we take the barge out of action and do regular upkeep and checkups this may have been caught a\nbit earlier and may not have been as severe. The barge is the lifeline of LSJ and we need to make\nadjustments going forward to take it out of commission for regular inspections and maintenance and\nthis goes for all the equipment and machinery so we don't wait until its broke to fix it.\nBrice has the barge scheduled to go in for Monday\nThank you\nEmad Hanna\nProject Controller\nHBRK Associates\n301 East 66th St\nSuite 10F\nNew York, NY 10065\nCell\nLSJ Office\nSt. Thomas Office\nNY Office\nEFTA_R1_01479030\nEFTA02415516\n", "char_count": 1303}, {"efta_number": "EFTA02415516", "page_number": 1, "text_content": "Fax\nFrom: Jeffrey Epstein [mailto:jeevacation@gmail.com]\nSent: Wednesday, November 03, 2010 4:36 PM\nTo: Emad Hanna\nSubject: Fwd: LSJ: Big N\n-Forwarded message\nFrom: brice gordon\nDate: Wed, Nov 3, 2010 at 9:20 PM\nSubject: LSJ: Big N\nTo: jeevacation@gmail.com\nCc: Gary Kerney\nJeffrey\nAttached are photo's of the Barge Gate, Hydraulic Rams and housing that need to be repaired on\nBig N\nBasic the boxes the hold the Rams in place have cracked and the Top of the Barge Gate will need\nto be re fabricated and strengthened. Please note the crack on the top of the gate extends 2/3 rd's\nthe way along the top\nEstimated Costs of repairs are:\nLift Gate repair\n$7000.00\nHydraulic Ram Boxes (2) $6800.00\nHydraulic Rams (2)\nTBA\nHydraulic Rams, once they are removed Haul Over will be able estimate Repairs,\nEFTA_R1_01479031\nEFTA02415517\n", "char_count": 824}, {"efta_number": "EFTA02415516", "page_number": 2, "text_content": "probably looking at around $1500 per Ram\nHave scheduled the barge to be down next week for repairs, The General (Boyson) will used for\nany trips.\ncan we proceed with repairs\nBrice\nThe information contained in this communication is\nconfidential, may be attorney-client privileged, may\nconstitute inside information, and is intended only for\nthe use of the addressee. It is the property of\nJeffrey Epstein\nUnauthorized use, disclosure or copying of this\ncommunication or any part thereof is strictly prohibited\nand may be unlawful. If you have received this\ncommunication in error, please notify us immediately by\nreturn e-mail or by e-mail to jeevacation@gmail.com, and\ndestroy this communication and all copies thereof,\nincluding all attachments.\nEFTA_R1_01479032\nEFTA02415518\n", "char_count": 777}]}