{"efta_number": "EFTA02412786", "page_count": 2, "url": "https://epstein-data.com/EFTA02412786", "pdf_url": "https://epstein-data.com/pdf/EFTA02412786.pdf", "pages": [{"efta_number": "EFTA02412786", "page_number": 0, "text_content": "To:\nFrom:\nSent:\nJEE[jeevacation@gmail.com]\ncurtis R\nFri 4/17/2009 9:13:08 PM\nSubject: Re: Master suite draft budget\nTitle: Re: Master suite draft budget Ok-\nBut after Jules knocks it down - you have to pay to get ride of it - plus Jules might remove more than\njust the roof. In an hour..\nOn 4/17/09 5:06 PM, \"JEE\" <jeevacation@gmail.com> wrote:\nlets talk tomorrow\nOn Fri, Apr 17, 2009 at 5:06 PM, Jeffrey Epstein <jeevacation@gmail.com> wrote:\nyes... i can't see demo at 30k jules can knock it down in an hour\nOn Fri, Apr 17, 2009 at 5:04 PM, curtis R\nwrote:\nIn the General Conditions -$63,500 - Boscoe, Bruce, Casey and Carlos and Arran\nand any other labor-. This gets billed back to the\nconstruction budget\nAs well as Demolition $30,000\nIf we build with our own manpower, which we could, we would save. But it would\ntake from other island projects, of course.\nThis budget is based on subcontractors for\nRock work\nConcrete\nElectrical\nMilwork\nPlumbing.\nOn this one - We might be able to use Gary for the electric, Brian/Arran combo for\nthe plumbing-etc. we could do our own concrete - but ..\nIs that what you mean?\nOn 4/17/09 4:37 PM, \"JEE\" <jeevacation@gmail.com\n<http://jeevacation@gmail.com>> wrote:\ngive me incremental cost.. plese,, boscoe salary\nand others is a fixed cost whether or not i build\nEFTA_R1_01474532\nEFTA02412786\n", "char_count": 1332}, {"efta_number": "EFTA02412786", "page_number": 1, "text_content": "On Fri, Apr 17, 2009 at 3:50 PM, curtis R\nJeffrey,\nwrote:\nPlease find attached Draft Budget for the Master Suite.\nNotes:\n1. Demolition will include what is almost a ful gut job.\nthe entire roof\nall the columns\nthe existing floor in the bedroom section.\n2. The finishes need to be honed down and represent a large\nunknown.\n3. The cost is around $600 per square foot for a total of 1,372,690\nCall to review with Silvina or me for scope adjustment as needed.\nCurtis\nEFTA_R1_01474533\nEFTA02412787\n", "char_count": 493}]}