{"efta_number": "EFTA02412198", "page_count": 4, "url": "https://epstein-data.com/EFTA02412198", "pdf_url": "https://epstein-data.com/pdf/EFTA02412198.pdf", "pages": [{"efta_number": "EFTA02412198", "page_number": 0, "text_content": "To:\nCC:\nFrom:\nSent:\nGary Kerney\nJeffrey Epstein[jeevacation@gmail.com]\nShelley\nMon 6/14/2010 8:08:41 PM\nSubject: Re: Island - June\nlike this\nOn Jun 14, 2010, at 10:10 AM, Gary Kerney wrote:\nno attachment Gary\nFrom:\nSent: Sun 6/13/2010 7:37 PM\nTo: Jeffrey Epstein\nCc:\nGary Kerney; Doug Schoettle\nSubject: Island - June\nHi all,\nGary did a great job of putting this together. I've added some comments below and the\nspecific things I'm taking care of in a separate email.\nThank you,\nEFTA_R1_01473745\nEFTA02412198\n", "char_count": 509}, {"efta_number": "EFTA02412198", "page_number": 1, "text_content": "PLANS\nPick up latest marked drawings from Robert's office on Tuesday 15th, will make copy and send to Doug this week.\nDOCK\nSee attached image.\nLIBRARY\nStatus interior\n1.interiors complete by construction\nOutstanding issues\n1.ceiling treatment\nlon to visit week after next to start painting - work duration 2-3 weeks - estimated\ncompletion date July 8th\n2.cabinet finishes awaiting panel from Paris, delay now due in this week by the 19th\n3.floor finishes Je to decide on next visit to Island, decision made by July 1st.\nStatus exterior\n1.courtyard paving underway complete by the July 31\n2.irragation main line underway complete by July 15\n3. wall sconces to replace existing, will get info on them from Robert's office\nOutstanding issues\n1.landscape plans\na.plants Igala to fill in area behind tiki hut with plants we chose awaiting new images from him\nb.irragation plans\nc.lighting will send sample lighting options via email this week\n2.Igala has trees tagged ready for delivery as soon as barge is ready\nMASTER SUITE\nStatus interior\n1.const under way,subject to decisions being made should finish by Oct 31\nOutstanding issues\n1.steam bench\n2.out side shower\n3.lites over bed\nEFTA_R1_01473746\nEFTA02412199\n", "char_count": 1209}, {"efta_number": "EFTA02412198", "page_number": 2, "text_content": "4.lighting in bedroom\n5.electrical in bath area\n6.tub deck and surround\n7.selection of wood floor\n8.sourcing thassos slabs\n9.powderroom vanity plan\n10.shop drawings for stone\n11.order rug for bathroom\nStatus exterior\n1.wall under way, complete by Aug 31\nOutstanding issues\n1.landscape plans,.liting irr.\nKITCHEN\nStatus\n1.assume we get permit by July 1 should be complete by Nov.31\nOutstanding issues\n1.kitchen design\n2.stair and wall design to master\nLAUNDRY\n1.assume we get permit July 1 should complete by Oct 31\nCOTTAGES\n1.const underway should complete by Sept 30\nOutstanding issues\n1.shower design\nOther guest cottage to be built in same complex: revisit idea on next visit\nMAIN HOUSE REMODEL\nStatus no estimate to compleation til program complete\n1.courtyard side plan final, proceeding\n2.roofing proceeding\nOutstanding issues\n1.north side program\nMECHINICAL ELECTRICAL Status under way should complete by Sept 30\nEFTA_R1_01473747\nEFTA02412200\n", "char_count": 950}, {"efta_number": "EFTA02412198", "page_number": 3, "text_content": "MECHANICAL DESAL Status under way should complete by Nov 30\nPOOL/THEATER\n1.Gensler allow three months for plans\n2.two months for permits Nov 30\n3.pool by Mar 31\n4. theater by Jun 30\nEFTA_R1_01473748\nEFTA02412201\n", "char_count": 212}]}