{"efta_number": "EFTA02409028", "page_count": 3, "url": "https://epstein-data.com/EFTA02409028", "pdf_url": "https://epstein-data.com/pdf/EFTA02409028.pdf", "pages": [{"efta_number": "EFTA02409028", "page_number": 0, "text_content": "To:\nFrom:\nSent:\nJeevacation[jeevacation@gmail.com]\nSun 11/21/2010 2:43:12 AM\nSubject: Gary Kerney's To Do List\nDate Updated Nov. 19,2010\nName: Gary\nLSJ\nLibrary\nJeffrey's To Do List\nOutstanding Issues:\n1.Ceiling Treatment: Ion working\n2. Cabinet finishes\n3. Floor finishes-open issue\nMaster Suite:\nStatus Interior\n1. Thassos starting 9/20 takes 2 months(11/20)\n2. Wood floors 11/20 to 12/20\n3. Occupy 1/20\nOutstanding Issues\n1.out side shower\n2.lites over bed\nwill mock up for next visit\nDoug\nEFTA_R1_01469001\nEFTA02409028\n", "char_count": 522}, {"efta_number": "EFTA02409028", "page_number": 1, "text_content": "3.lighting in bedroom\nDoug\nKitchen:\nWall finish?\nComplete 2/28/11\nLaundry:\n1.complete 12/1\nCottages:\nWall refinished for Ion 11/25/10\nMarble vanities 11/25/10\nOutstanding Issues:\n1.Shower Design Doug\nMechanical Electrical:\nStatus under way should complete by\nMechanical Desal:\nStatus under way should complete by Nov 30\nPOOL/THEATER\nZeff planning\nPOP'S GARDEN\n1.underway\nDock House/Floating Dock\n1.plans being submitted 9/15\nHanger\nEFTA_R1_01469002\nEFTA02409029\n", "char_count": 462}, {"efta_number": "EFTA02409028", "page_number": 2, "text_content": "CZM\nHave been in contact with the Butler building rep. for the carrib.on hold pending approval\nStatus submitting by July 1\n1.Plans go in the 6/30being reviewed\n2.Assume approval by September 30\n3.Construction plans by November 31\n4.Permits by January 30\n5.Pool by June 30\nSPA\n6.Cottage by August 31\n7.Music room by June 30\n8. Tennis by April 30\nDejonge will have plan by 9/1/10\nEFTA_R1_01469003\nEFTA02409030\n", "char_count": 408}]}