{"efta_number": "EFTA02407761", "page_count": 3, "url": "https://epstein-data.com/EFTA02407761", "pdf_url": "https://epstein-data.com/pdf/EFTA02407761.pdf", "pages": [{"efta_number": "EFTA02407761", "page_number": 0, "text_content": "To:\nCC:\nGary Kerney\njeevacation@gmail.com[jeevacation@gmail.com]; Bryan Oakes\nFrom:\nSent:\nWarwick Wicksman\nThur 8/12/2010 11:23:42 PM\nSubject: RE: LSJ living room and screening room\nHi Gary,\nI am following up on our conversation about converting the existing living room into the\nscreening room, and adding a new living room towards the east. I some concerns about\nthis that we need to review together:\nThe current layout of the main residence areas has the Living Room, the main \"public\nspace\", centrally located, on access with the main stairs, and adjacent the kitchen and\nguest cottages. I think this makes a lot of sense. It is the prime gathering space, and\nshould be centrally located.\nI understand the concerns about the Living Room being \"dark\". I think this could be\nresolved, by incorporating similar features that would be use in a new the living room. For\nexample, adding some large windows, similar to the expanded Kitchen, could brighten up\nthe room, and make it more usable.\nThe Living Room, re-worked upper terrace and pool area all flow together, making sense\nof this space. I do not think locating the Screening Room in that prime gathering space\noverlooking the pool makes as much sense.\nThe Screening Room itself functions separately from the rest of the residence areas. It\nwill be probably be used less frequently, and could stand alone from the other spaces,\nwithout impacting the use of the other spaces.\n• The existing Living Room would require significant demolition to be converted into a\nprofessional screening room, and it would substantially smaller than what we previously\ndiscussed.\n。 We would need to add acoustical walls within the building. I think this will\nreduce the overall usable space to about 21' wide x 32' long.\n。 We need about 9' for the projection booth and 4' for the speaker chase.\nThat would leave the screening room itself about 21' wide x 18' deep.\n。 The screen would end up being about 18' wide x 10' tall. Within the current\nbuilding height, it would be too close to the floor and ceiling.\n。 We would need to raise the booth about 4'-5', to get the projector to the\ncorrect elevation, above the heads of the viewers. It looks like we do not\nhave sufficient headroom for that.\n。 We may be able to create one step on the floor, to create a stadium seating\neffect, but we do not have enough headroom to do more than that,\nEFTA_R1_01467284\nEFTA02407761\n", "char_count": 2403}, {"efta_number": "EFTA02407761", "page_number": 1, "text_content": "。 To keep within the existing building envelope, we would need to excavate\ndown below grade to create sufficient headroom clearances.\nThese concerns lead to the idea that we renovate the existing Living Room, adding\nwindows to make it feel brighter and more pleasant, and we consider adding a smaller\nscreening room, more similar in scale to the existing Living Room, east of the Living\nRoom. We can make it smaller to fit more with the rest of the buildings scale, yet\naccommodate professional screening room features.\nGary, we talked about the fact that we have now exhausted the current redesign\nallowance, and you requested a new Work Authorization to continue the conceptual\ndesign work. However, I propose we do the following first:\n1. We are preparing some diagrams that graphically show the concerns we have with the\nLiving Room conversion to screening room.\n2. We will prepare some diagrams that show this new layout, similar to the latest design,\nbut with a smaller, more in-scale but still professional Screening Room.\n3. Once that we review this together, we can either:\na. Move forward with a new design proposal for the overall project, or\nb. Split the pool area and screening room apart contractually, allowing us to\nproceed with pool area development towards a permit, and pursue the\nalternate screening room concepts separately. (This would speed up your\nmain construction schedule.)\nAs to a meeting on the Island on 8/30, I do not think that leaves us enough time to\ndevelop this new concept, and prepare the 3D images for review. Once we discuss this\nmore, and figure out the right path, we can establish a schedule for deliverable and\nmeetings. I think it would be closer to 9/15/10.\nI look forward to your comments! Doug, please weigh in on your thoughts!\nThanks!\nWarwick\nWarwick Wicksman, AIA\nPrincipal\nGensler\nEFTA_R1_01467285\nEFTA02407762\n", "char_count": 1863}, {"efta_number": "EFTA02407761", "page_number": 2, "text_content": "2500 Broadway\nSuite 300\nSanta Monica, California 90404\nUSA\n-----Original Message-----\nFrom: Gary Kerney [mailto:\nSent: Wednesday, August 11, 2010 8:43 AM\nTo: Warwick Wicksman\nSubject:\nIf possible the 30 and 31 of aug at island. Gary\nSent from my iPhone\nEFTA_R1_01467286\nEFTA02407763\n", "char_count": 283}]}