{"efta_number": "EFTA02403174", "page_count": 3, "url": "https://epstein-data.com/EFTA02403174", "pdf_url": "https://epstein-data.com/pdf/EFTA02403174.pdf", "pages": [{"efta_number": "EFTA02403174", "page_number": 0, "text_content": "STUDIO ARTHUR CASAS\nGREAT ST. JAMES ISLAND\nISLAND\nGREAT ST JAMES ISLAND\nROOM\nMAIN HOUSE\nLIVING\nPROJECT SCOPE\nAREA (ARCHITECTURAL) PERIMETER (ARCHITECTURAL)\n157 acres\n4 miles\nAREA (SQ/FT)\nTOTAL AREA (SQ/FT)\n1.500,00\n1.500,00\nPOWDERROOM\n100,00\n100,00\nKITCHEN\n500,00\n500,00\nBREAKFAST ROOM\n250,00\n250,00\nAREA FOR LUNCH\n400,00\n400,00\nMASTER BEDROOM\n600,00\nMASTER SUITE\nCLOSET MASTER\n200,00\n1.400,00\nMASTER BATHROOM\n600,00\nBEDROOM 01\n250,00\nSUITE 01\nCLOSET 01\n50,00\n400,00\nBATHROOM 01\n100,00\nBEDROOM 02\n250,00\nSUITE 02\nCLOSET 02\n50,00\n400,00\nBATHROOM 02\n100,00\nBEDROOM 03\n250,00\nSUITE 03\nCLOSET 03\n50,00\n400,00\nBATHROOM 03\n100,00\nOFFICE\n700,00\nOFFICE\n850,00\nOFFICE BATHROOM\n150,00\nLIBRARY\n500,00\nLIBRARY\n600,00\nLIBRARY BATHROOM\n100,00\nTHEATER\n2.000,00\nMOVIE THEATER\n2.100,00\nTHEATER BATHROOM\n100,00\nEFTA_R1_01441684\nEFTA02403174\n", "char_count": 823}, {"efta_number": "EFTA02403174", "page_number": 1, "text_content": "SPA\nPOOL\nTOTAL MAIN HOUSE\nCIRCULATION\nGRAND TOTAL MAIN HOUSE\nSECONDARY CONSTRUCTIONS\n400,00\n400,00\n4.000,00\n4.000,00\n13.300,00\n4.156,25\n3.325,00\n16.625,00\nLOUNGE 01\n600,00\nLOUNGE AREA 01\n700,00\nBATHROOM LOUNGE 01\n100,00\nLOUNGE 02\n600,00\nLOUNGE AREA 02\n700,00\nBATHROOM LOUNGE 02\n100,00\nLOUNGE 03\n600,00\nLOUNGE AREA 03\n700,00\nBATHROOM LOUNGE 03\n100,00\nLOUNGE 04\n600,00\nLOUNGE AREA 04\n700,00\nBATHROOM LOUNGE 04\n100,00\nLOUNGE 05\n600,00\nLOUNGE AREA 05\n700,00\nBATHROOM LOUNGE 05\n100,00\nSTAFF BEDROOM 01\n250,00\nSTAFF BATHROOM 01\n100,00\nSTAFF HOUSE 01\nSTAFF CLOSET 01\n70,00\n820,00\nSTAFF LIVING 01\n250,00\nSTAFF KITCHEN 01\n150,00\nSTAFF BEDROOM 02\n250,00\nSTAFF BATHROOM 02\n100,00\nSTAFF HOUSE 02\nSTAFF CLOSET 02\n70,00\n820,00\nSTAFF LIVING 03\n250,00\nSTAFF KITCHEN 02\n150,00\nSTAFF BEDROOM 03\n250,00\nSTAFF BATHROOM 03\n100,00\nSTAFF HOUSE 01\nSTAFF CLOSET 03\n70,00\n820,00\nSTAFF LIVING 01\n250,00\nSTAFF KITCHEN 03\n150,00\nLAUNDRY\n150,00\n150,00\nGAS STATION\n600,00\nWATER STATION\n1.000,00\nEFTA_R1_01441685\nEFTA02403175\n", "char_count": 994}, {"efta_number": "EFTA02403174", "page_number": 2, "text_content": "TECHNICAL AREA\nENERGY STATION\n1.000,00\n5.100,00\nWORKSHOP\n1.500,00\nPARKING AREA\n1.000,00\nSTAFF AREA\nSTAFF CHANGING AREA\nGRAND TOTAL SECONDARY CONSTRUCTION\nOUTDOOR AREAS\n350,00\n350,00\n350,00\n350,00\n11.910,00\nHELIPAD 01\n7.000,00\nHELIPAD 01\nBATHROOM HELIPAD 01\n100,00\n7.300,00\nSITTING AREA\n200,00\nHELIPAD 02\n7.000,00\nHELIPAD 02\nBATHROOM HELIPAD 02\n100,00\n7.300,00\nSITTING AREA\n200,00\nDOCK 01\nDOCK 02\nRUNNING PATH\nGRAND TOTAL OUTDOOR\nFINAL TOTAL\n1.300,00\n1.300,00\n1.300,00\n1.300,00\n130.000,00\n130.000,00\n147.200,00\n175.735,00\nEFTA_R1_01441686\nEFTA02403176\n", "char_count": 551}]}