{"efta_number": "EFTA02400190", "page_count": 2, "url": "https://epstein-data.com/EFTA02400190", "pdf_url": "https://epstein-data.com/pdf/EFTA02400190.pdf", "pages": [{"efta_number": "EFTA02400190", "page_number": 0, "text_content": "From:\nSent:\nTo:\nSubject:\nAnn Rodriquez\nThursday, May 12, 2016 11:31 PM\nJeffrey\nGSJ Bathrooms\nHey Bossman,\nMr. Luciano bid (<=pan style=\"background-color: rgba(255, 255, 255, 0);\">$15,473.00) </=pan>to do all the Bathrooms\nin ceramic tiles.\nI'm still waiting on a Quote from Mr. Dia Villa.\nAnn R.\nBegin forwarded message:\n=div>From: lemmond luciano\nDate: May 12, 2016 at 7:26:47-PM AST\nTo: Ann Rodriquez <■\nSubject: Re: LSJ: Anna=br>\n<=iv>\n<=div>\n&nb=p;\n&=bsp;\nmaster bathroom\n(1) remove all existing wall and shower tile\n(2) replace gypsum board\n=div>\n(3) install new gypsum boar and durock in shower wall\n(4) install 300 sqf of ceramic tile in wall and showe= floor\n&=bsp;\n=nbsp;\n&nbs=;\ntotal &n=sp;\n=nbsp;\n&nbs=;\n&n=sp;\n=nbsp;\n$6=525\n&nbs=;\n&n=sp;\nbathroom 2\n(1)revove bathroom floor tile\n(2) install now durock in showr floor\n(3) install 228 sqf of cer=mic tile in walls and bathroom floor\nEFTA_R1_01435454\nEFTA02400190\n", "char_count": 923}, {"efta_number": "EFTA02400190", "page_number": 1, "text_content": "&=bsp;\n&nb=p; total labor&=bsp;\n&nb=p;\n&=bsp;\n=$ 4,474\n=nbsp;\n&nbs=;\n&n=sp;\n=nbsp;\n&nbs=;\n&n=sp; bathroom 3\n(1) rem-ve bathrrom floor tile\n(2)&nb=p; install new durock in shower floor\n(3) install 228 sqf of ceramic tile in walls and bathsroom floor&nb=p;\n=\n&nb=p;\n<J=>\n&=bsp; total labor\n&nb=p;\n&=bsp;\n$ 4,474\n15,4=3\n&n=sp;\n&=bsp;\n=nbsp;\ngrand total &nbs=;\n&n=sp;\n=nbsp;\n&nbs=;\n&n=sp; $\n<mailto:\nOn Thu, May 12, 2016 at 5:23 PM, Ann Rodriquez <a\n>w=ote:\nHi Luciano,\nPlease reply with quote. Hopefully this will work.\nAnn R.\n2\nEFTA_R1_01435455\nEFTA02400191\n", "char_count": 556}]}