{"efta_number": "EFTA02124709", "page_count": 1, "url": "https://epstein-data.com/EFTA02124709", "pdf_url": "https://epstein-data.com/pdf/EFTA02124709.pdf", "pages": [{"efta_number": "EFTA02124709", "page_number": 0, "text_content": "To:\nCC:\nFrom:\nSent:\nRichard Barnett[\nmtollison@hotmail.com[||\nWed 10/16/2013 4:06:35 PM\nSubject: Re: Final Work on Cooling Tower\nJeffrey said OK!!\nOn Oct 16, 2013, at 11:02 AM, Richard Barnett wrote:\nHi please ask Mr. Epstein If the electrician and I can gain access to 71st\ntomorrow 10/17 at 7:15 am to work on the roof cooling tower & 6th floor\nelectrical control panel. I will have the electrician come in the side service\nentrance up to the 5th floor and walk up to the 6th floor mechanical room from\nthe back fire stairs, not to disturb Mr. Epstein if he is on the 6th floor. I am sorry\nwe have to schedule this work while Mr.Epstein is in residence, but I gave the\ncooling tower people a hard time to come and complete this final piece electrical\nand control work. Thanks Rich B.\nEFTA_R1_00761164\nEFTA02124709\n", "char_count": 816}]}