{"efta_number": "EFTA02021974", "page_count": 1, "url": "https://epstein-data.com/EFTA02021974", "pdf_url": "https://epstein-data.com/pdf/EFTA02021974.pdf", "pages": [{"efta_number": "EFTA02021974", "page_number": 0, "text_content": "To:\njeevacation@gmail.com[jeevacation@gmail.com];\njeevacation@gmail.com/jeevacation@gmail.com]\nCC:\nFrom:\nSent:\nFri 6/1/2012 7:44:39 PM\nSubject: Gll wing attach\nJeffrey,\nMorrison just notified my of an emergency bulletin issued by Gulfstream, must be complied by July 18th or 10\nflight hours.\nIt is an inspection on GII and GIII aircraft, area of concern is wing attach fitting for proper gap, if repairs have\nbeen done by a repair facility in regards to wing attach fitting area. We did have work in the wing attach area 6\nyears ago due to corrosion, and Gulfstream has looked in this area during our 72 month inspection this year. It\ndo not expect a problem, I plan to have this AD complied with June 17th on return to Teterboro if you agree with\nthis? my other option is to have Meridian in Teterboro complete this visual inspection tonight? it takes two hours\nonly, if there is a problem, we are grounded and will have to ferry to heavy maintenance facility, Midcoast (St\nLouis or Gulfstream PBI).\nIt may make sense to have Gulftream or other heavy maintenance facility comply with inspection, in case there\nis an issue found.\nGulfstream found a large gap on an old Gll that had maintenance completed in the wing attach fitting area that\nwas done incorrectly with Gulfstream repair drawings, this problem in turn effects all operators in the fleet.\ndo you agree with compliance on June 17th, when we return to NY?\nthank you,\nLarry\nEFTA_R1_00527998\nEFTA02021974\n", "char_count": 1464}]}