{"efta_number": "EFTA02021676", "page_count": 2, "url": "https://epstein-data.com/EFTA02021676", "pdf_url": "https://epstein-data.com/pdf/EFTA02021676.pdf", "pages": [{"efta_number": "EFTA02021676", "page_number": 0, "text_content": "Greetings Mr. Epstein,\nSeptember 30 project list photographs, and 3 new items, for your review and comments. The\nitems highlighted were not photographed today:\n1. Courtyard\n2. Grading main engineering road\n3. Finish Main pool shelter\n4. Tennis court and other main lights\n5. Cabana 4\n6. Gym - cabinet company visited site - will forward drawing and proposal\n7. Cabana 4 furnishing - bed/headboard/armoire on site - Sarah researching round bedside tables -\nbath fixtures on site\n8. Flagpole bath and cabana - need JE clothes and shoes - bath fixtures on site - closet accessories\non order\n9. Main pool bath - furnish - fixtures on site\n10. Palm trees deliver to island 10/1\n11. Sod delivery postponed by sod farm\n12. Tiling in progress\n13. Main planter\n14. Brice cottage\n15. Dock house\n16. Electrify info center\n17. Five Palms\n18. Grotto\n19. Blue beach landscaping - plant palms week of 10/1\n20. Heli wall\n21. Curb for all roads\n22. Night lights to motor court on order\n23. Steps to library\n24. Library path\n25. Benches\n26. Driveway entry\n27. Pool ladders\n28. Flagpole lights are too hot\n29. Flagpole grading\n30. Flagpole wall banks\n31. Stereo - Larry ordering speakers, Brice ordering speaker wire\n32. Computer - Lion installed\n33. Molyneux desk - not on site - in process of being crated - no shipping date as yet\n34. Jet skis - shipping 9/28\n35. Midnight Express - Larry has until 10/10 to try to sell - if not, will arrange shipping to island\n36. Library landscaping\n37. Pool palms - deliver to island 10/1 (please see #10)\n38. Color in basket\n39. Waterfall\nEFTA_R1_00527542\nEFTA02021676\n", "char_count": 1591}, {"efta_number": "EFTA02021676", "page_number": 1, "text_content": "40. Banquette\n41. Big wind doors\n42. High Flagpole road - bulldozer is on the main house grading, Peter is working on the main\nplanter preparation, the road clearing is in progress\n43. Main pool shelter (please see #3)\n44. St. John terrace\n45. Hangar - painting in progress\n46. Motor court\n47. Archer platform\n48. Bed\n49. Plants bought from Italian woman - presently located on the beach and at the nursery\nRespectfully submitted,\nDaphne\nEFTA_R1_00527543\nEFTA02021677\n", "char_count": 468}]}