{"efta_number": "EFTA02018359", "page_count": 1, "url": "https://epstein-data.com/EFTA02018359", "pdf_url": "https://epstein-data.com/pdf/EFTA02018359.pdf", "pages": [{"efta_number": "EFTA02018359", "page_number": 0, "text_content": "To:\njeevacation@gmail.com[jeevacation@gmail.com];\njeevacation@gmail.com[jeevacation@gmail.com]\nFrom: Lvjet\nSent:\nThur 3/15/2012 10:53:57 PM\nSubject:\nGII/B727\nJeffrey,\nThe Boeing is completed and aux tank operational,.\nGII update\nNeed to install Rudder, both elevators and rig flight contols tomorrow, engine runs on saturday, once controls are\nrigged and installed,. Saturday and Sunday would be overtime, and still don't think it will be ready for flight, there\nis always something that will not ops check good,.\npersonally think Monday is real, aircraft will need full cleaning exterior, interior and stainless steel bright work\nneeds to be polished, which will take a full day, we could pass on this, but should be accomplished,.\nthx,\nlarry\nEFTA_R1_00522300\nEFTA02018359\n", "char_count": 774}]}