{"efta_number": "EFTA02017987", "page_count": 1, "url": "https://epstein-data.com/EFTA02017987", "pdf_url": "https://epstein-data.com/pdf/EFTA02017987.pdf", "pages": [{"efta_number": "EFTA02017987", "page_number": 0, "text_content": "jeevacation@gmail.com[jeevacation@gmail.com]; Jeffrey Epstein[jeevacation@gmail.com]\nRichard Kahn\nTo:\nCC:\nFrom:\nCraig Martin\nSent:\nSubject:\nThur 5/17/2012 12:09:44 AM\nConcrete Pad Budget\nLSJ Concrete Pad2 Sheet1.pdf\nLSJ ConPad3 Labor Sheet1.pdf\nJeffery;\nPlease see attached spread sheets.\nTab One is revised budget\nTab Two is outside labor breakdown.\n1. Revised Budget. Note price reduction from $50k to $40k with the removal of LSJ labor and\nsome small items. There is an increase in the outside labor under wood/formwork as Tom thinks\nhe needs experienced help in this area.\n2. LSJ labor, not shown here, will be used to assist the outside labor team. Excavation, material\nreceiving and handling, compaction, equipment repair., etc. On concrete pour days we will need\n10 pp. 5 outside and 5 from LSJ.\nPlease let me know your thought sand how you want to proceed.\nCraig\nEFTA_R1_00521709\nEFTA02017987\n", "char_count": 901}]}