{"efta_number": "EFTA02007830", "page_count": 3, "url": "https://epstein-data.com/EFTA02007830", "pdf_url": "https://epstein-data.com/pdf/EFTA02007830.pdf", "pages": [{"efta_number": "EFTA02007830", "page_number": 0, "text_content": "JE Punch List - July 27, 2012 Directive Updates\n1. Clean Up - make as many barge runs as necessary\n- Top of Desal plant\n- Engineering\n- Cleaning the shops - ongoing\n2. Equipment and Vehicles\n- Sell equipment\n- Bikes should be ready to be sold - no sales without JE approval - bike sale list forwarded to Brice 7/24 - will\nbe forwarded for JE approval\n-No machinery off the island unless approved\n-Buy new Kawasaki bikes and mules - (5) 2012 Kawasaki 750 EPS and (2) 2012 Kawasaki Mule 4010 purchased\n-wire sent 7/26\n-Kawasaki parts order submitted twice - awaiting direction\n- Remove all concrete trucks and cement hopper no later than 7/27\n- Cement hopper scheduled to be transported to the Heavy Materials - St. John yard for storage -\nstorage is free-crane/tractor/low boy rental $4,300 - pending Boyson reschedule and JE approval -\nBoyson unable to provide rescheduling information until after 7/30\n- Concrete trucks - transported to Heavy Materials STT 7/24-storage free - transport $300 -\nper Brice approved by JE - COMPLETE\n3. Computers\n- Buy new computers-2 Macs Desktops & 1 Laptop - Captains' Office - ordered\n4. Five Palms\nInternet/Phone Switch installed - broken fiber discovered 7/24 - Danny repaired 1 of 2 - replacement\ntermination tips arrived 7/27 - Danny has them in his possession\n-Phone set up left of desk-switch installed 7/20 - COMPLETE\n- Wireless inside only - as of date 7/10 via JE - installed 7/24 - COMPLETE\n-Computer - as of date 7/10 not required via JE\n- Exterior Door Shutters - estimate forwarded to JE 7/12 - $2,865.00 - awaiting direction\n-Painting-outside to be completed via JE direction\n- Inside to be completed via JE direction - Ion\n-Tapestry Molding for Ceiling - lon\n- Furniture - outside furniture ordered-sailing 7/27 - EDA to STT 7/31\n- Piano Bench-mounted 7/18 - COMPLETE\n-Piano-schedule to re-tune week of 8/15\n- Picture Frame - measurements forwarded to Sarah - 86 x 70\n-Mirrored siding-liquid nails - will cover entire panel with glue when the next one falls off\n-Transformer Protection Wall - should be built - work to start 7/30\n- Floor Gold Lamps - electrical wiring needs to be replaced - COMPLETE\n- Fire pit - fix - a new propane tank was installed but it is now empty - Danny and Brian suspect there is a leak -\nthey will replace the piping\n5. Grotto\n- Furniture - put back in grotto\n- Curtains - more curtains ordered-cream for the bed at the base of the grotto - expected to arrive to Zorro\nto take to LSJ 7/31\n-Genset wiring - COMPLETE - Danny reviewing auto start from Kite House - need to purchase part from\nElectronics Unlimited - out of stock - Danny to contact vendor for status on restock\n6. Berm/Top of Hill\n-Stone threshold needs total re-do- must be level and straight - commenced 7/27\n- Boulders - Jules to finish boulder work - once stone threshold completed\n- Electrical - Low voltage transformer in place - placement & connection of lights - COMPLETE\nEFTA_R1_00507897\nEFTA02007830\n", "char_count": 2952}, {"efta_number": "EFTA02007830", "page_number": 1, "text_content": "- Main transformer on site - installed 7/19 - COMPLETE\n7. Engineering/Maintenance Yard\n- Steel Shed concrete pad - COMPLETE\n-Metal Sheets - on old building replaced - COMPLETE\n- Power sanding/rust removal complete - painting in progress\n- Engineering Storage & Shelving - concrete wall repaired 7/27\n- Landscaping-quote for Sea grapes forwarded to JE 7/12 - awaiting direction\n- Landscaper(s) to travel to Josephine's nursery (Coral Bay) - trip cancelled\n- Engineering water boundary - Jules - COMPLETE\n8. Triangle-\n- Peter transplanted 3 palms from engineering per JE directive 7/26 - COMPLETE\n9. Flagpole Pool Cabana-\n- Furniture-investigate new desk, new furniture more like Pool Cabana PBI\n- relocate orange sofa to Media Room\n-Check water pressure in shower - Danny discovered the pressure equalizer tank was not pressurized-he\npressurized and adjusted - COMPLETE\n10. Floating Dock\n-Jet ski bumpers -ordered-presently on backorder - Overton will email Carlos when they are shipped out\n-Table/Dock Box\n- Dock box handles - COMPLETE\n- Dock box top to be resurfaced\n-Dock floors - staining needs completion - COMPLETE\n- Swim Ladder - direction from JE on placement required\n- Dive Platform - require construction details\n- Wooden Bumpers - to cover concrete stripping - COMPLETE\n- Painting - Railing, Cross Brackets & Robe Hooks - COMPLETE\n11. Entry Tree Lights\n- Lights on site, electrical installation - COMPLETE\n12. Solutions for Generators\n-Soundproofing Installation - back wall and door - COMPLETE - JE is concerned may not be adequate for\ndeep sound penetration\n13. Tiki\n-Shields left Papua 7/24-EDA in FL 7/29 - Lund & Pullara will clear and transport to Tropical\n14. Kite House\n- relocation of outside furniture from 5 Palms once new 5 Palms furniture on site\n15. Chillax Room\n- requires furniture piece for electrical/media equipment - Sarah\n16. Chillax Bathroom\n- require blue rugs for bathroom & vanity area - Sarah\n17. Mechanical Building\n- Replacement Transformer-estimated date to be shipped from factory (Illinois) 8/21\n18. Boats\n- Lady G-sell-in hurricane storage 7/18\n- Lady K - sell - survey forwarded to Darren & Rich, suggested price $225,000\n- Big N -repair-will go to Subbase Drydock after 8/7\n19. Timers\n- Review installing timers on air conditioners, irrigation water systems, and lights\n- Set all air conditioning to 85 degrees (no need to keep anything cooler)\n- No irrigation week of 7/23\n20. Beach lighting\n- per JE, replace existing transformers for the beach lighting of palms around the salt pond and beach\nEFTA_R1_00507898\nEFTA02007831\n", "char_count": 2571}, {"efta_number": "EFTA02007830", "page_number": 2, "text_content": "21. Transient Surge Protection - will review and forward estimate ASAP - Danny\n22. Ice Maker - on LSJ 7/25\n23. Landscaping\n-Soil material on site - soil removed from beds 7/16-area replanted - COMPLETE\n-Finish sundial corner (trees, stones, hydro-seed) - more trees transplanted, per JE - COMPLETE\n- Clean up areas marked in paint - COMPLETE\n- Prepared banana area for pineapples 7/24 - 100 pineapples picked up and planted 7/26 - COMPLETE\n- Plantings - removed the plantings that are anywhere near the bottle palms, per JE - COMPLETE\n24. Solar lights-ordered-place every 30 feet - EDA on STT 7/28\n25. Roads-grade - Jules work continues\n26. Library\n- Lights on bookshelves need attention - Danny to repair\n-Temperature - STABLE\n- Repair hanging wooden louver - COMPLETE\n27. Main hill\n-Asphalt path - pour asphalt ends in concrete - top and bottom have been formed, concrete poured at top\nand bottom - stones placed at bottom and top 7/25 - COMPLETE\n28. New Employee Bathrooms\n29. Gym\n- New punching bag - arrived at 71st - will come down on the next plane trip\n-Wiring - balance cables on site - final tidy up 7/20 - COMPLETE\n- Audio cables purchased - installed 7/20 - COMPLETE\n- Yoga room air does not work - Danny replaced the batteries - COMPLETE\n30. Benches\n31. Danny Vicars - boat driving lessons in progress\n32. Beach Office\n- complete electrical overall required\n-waterproofing/sealing/painting/replace rotten wood required\n33. LSJ Mooring - Darren will forward to Army Corp for final approval - 7/12\n34. AYH Dock - re-sanding/staining of Nanna dock - COMPLETE\n35. Main Compound Cistern - Demo work complete - confirmed multi leaks - repair work required\n36 Hangar\n- Jermaine to redo internet at hangar - forward quote for rack enclosure 7/24 - awaiting approval\n- Fuel Containment Pad - draft approved with drainage incorporated, waiting for updated plan\n37. Woodshop Tunnel - floor needs to epoxy-clearing area\n38. Master bedroom area - add many lights in master bedroom planter - Danny 7/26 - COMPLETE\n39. Little C-new engine has a blown head - Fred (Offshore Marine) came out 7/27 - two holes in the new\nengine block - one is above the oil filter and the other is above the shift assembly - Fred to contact Brice\nEFTA_R1_00507899\nEFTA02007832\n", "char_count": 2255}]}