{"efta_number": "EFTA02001905", "page_count": 3, "url": "https://epstein-data.com/EFTA02001905", "pdf_url": "https://epstein-data.com/pdf/EFTA02001905.pdf", "pages": [{"efta_number": "EFTA02001905", "page_number": 0, "text_content": "To:\njeevacation@gmail.com[jeevacation@gmail.com];\njeevacation@gmail.com[jeevacation@gmail.com];\nCC:\nFrom:\nSent:\nWarwick Wicksman\nWed 2/23/2011 3:21:59 PM\nSubject:\nRe: flagpole pool\nI'll get you a proposal for plans sections and elevations today.\nThanks,\nWarwick Wicksman\nPrincipal\nSent from my BlackBerry Device.\nTom Sze\nFrom: Gary Kerney\nTo: Warwick Wicksman; Tom Sze\nCc: Jeffrey Epstein <jeevacation@gmail.com>; William Rowles\ntjmelnick@hotmail.com\nSent: Wed Feb 23 07:20:27 2011\nSubject: RE: flagpole pool\nWarwick\nIt is a very simple building, and I gave you the design outline,I will do structuals here and we are using trusses,I\nwould think you can get me a set of drawings in a couple days.\nPlease call me\nGary\nFrom: Warwick Wicksman\nSent: Tue 2/22/2011 8:13 PM\nTo: Gary Kerney; Tom Sze\nCc: Jeffrey Epstein; William Rowles; tjmelnick@hotmail.com\nSubject: RE: flagpole pool\nGary,\nI got the sketches you sent, and attached is an updated plan sketch based on the new comments. But I am\nconfused about what you are asking us to provide. Our proposal was for conceptual design. It sounds like\nyou are jumping from that to permit drawings in one week. Is that what you now need? And who is\nengineering the building, including the slab and foundations?\nThanks,\nWarwick\nEFTA_R1_00498972\nEFTA02001905\n", "char_count": 1298}, {"efta_number": "EFTA02001905", "page_number": 1, "text_content": "Warwick Wicksman, AIA\nPrincipal\nGensler\nhttp://www.Gensler.com\nClick here to view Gensler's 2010 Annual Report.\nFrom: Gary Kerney\nSent: Saturday, February 19, 2011 7:09 AM\nTo: Warwick Wicksman; Tom Sze\nCe: Jeffrey Epstein; William Rowles;\nSubject: flagpole pool\nWawick\nSpecifications for construction development drawings.I need a quick turn around,can form slab next week.\nRevised bath and kitchen programs attached\nRevised site plan attached\nBUILDING\nblock structure\n10' ceiling\nplaster finish in and out\ntruss roof\ninsulated and corr.metal roofing same as main compound\ncrown molding and copper gutter same as main compound\nroll down hurricane shutters on 8' sliding glass doors(jeffrey mirrored?)\nEFTA_R1_00498973\nEFTA02001906\n", "char_count": 731}, {"efta_number": "EFTA02001905", "page_number": 2, "text_content": "mechinacial awnning over sliding door\nall other doors slabs\nINTERIOR\nfloors stained concrete floors\nmanufactured kitchen cabinets\n30\" refrigerator\n30\"range\nIce maker\ndbl. sink\nbath to be ceramic tile floor and shower(small 1\"+-)\nwood vanity top,with vessel sink\nGrohe shower fixtures all other American Standerd or eq.\ncorner sconces in livingroom\nrecess can liting\nall liting on dimmers\nall base wall outlets to be 1/2 switched\nPOOL\ncurrent thinking to reflect on next generation of image review\n10x30 shade structure one each side\n2x2 plaster col's 9' high\n10\" thick solid top (2' overhang?)\nceiling cans,col. sconces,ceiling fans\nEFTA_R1_00498974\nEFTA02001907\n", "char_count": 663}]}