{"efta_number": "EFTA01991173", "page_count": 5, "url": "https://epstein-data.com/EFTA01991173", "pdf_url": "https://epstein-data.com/pdf/EFTA01991173.pdf", "pages": [{"efta_number": "EFTA01991173", "page_number": 0, "text_content": "To: \njeevacationepgmail.comfjeevacation©gmail.comi: J Epstein[jeevacation©gmail.com] \nFrom: \nBMG \nSent \nMon 3/5/2012 2:57:09 PM \nSubject: Fwd: Heavy Material \nAs requested \nHeavy Material cost \nSent from my iPhone \nBegin forwarded message: \nFrom: Monique Harry •MMMIIMI \nDate: March 5, 2012 10:20:44 AM GMT-04:00 \nTo: Brice Gordon \nCc: Rich Kahn \n, Thomas Melnick \nSubject: FW: eavy \natena \nBrice, \nPer your request total estimated cost for project needing aggregate on LSJ (Stone, \nColumbian Sand, & Manufactured Sand) is $38,216.66. (Trucking included \n$6,561.00) Detail as followed below. \nGrotto 35 yards = $3,039.62 \nFlag Pole 75 yards = $6,521.17 \nHeli pad 40 yards = $3,178.92 \nTriangle 60 yards = $5,222.34 \nSundial 10 yards = $667.89 \nFive Palms 65 yards = $5,901.28 \nDuct Bank 80 yards @ Five Palms including 3 add loads of MFS for underground work = \n$11,502.72 \nMisc Pour 25 yards = $2,182.72 \n1 can also provide the total dollar amount of sand, MFS, and stone per each job if needed. \nMONIQUE HAPPY \nProject Administrator \nLSJ, LLC \nEFTA_R1_00484068 \nEFTA01991173\n", "char_count": 1077}, {"efta_number": "EFTA01991173", "page_number": 1, "text_content": "Fr \nTo: \nCC \nSubject: FW: Heavy Material \nDate: Wed, 22 Feb 2012 13:07:40 -0400 \nRich, \nAverage of material used is based on type of concete mix. (cx. Devil mix dry, 4000 psi, \ngrout mix) This estimation is based on an average of 1500 lbs of stone per yard, \n600 lbs of columbian sand per yard, and 1200 lbs of Manf Sand per yard. (2000 lbs \n= I ton) \nPer Tom's estimation below an approx 390 yards of concrete will be batched which breaks \ndown to: \n293 tons of stone (requested 400 tons) \n117 tons of Col (requested 500 tons) \n324 tons of MFs (requested 500 tons) \nNote: Material that is not batch which is taken by bucket or bakkero is used in motar mix \nfor stone walls and concrete walls, dry repair of roads (holes), Lanscaping \nMONIQUE HARRY \nProject Administrator \nLSJ, LLC \nDate: Wed, 22 Feb 2012 10:40:53 -0500 \nSubject: Re: FW: Heavy Material \nFro \nTo: \nMonique ...good day ... a rough estimate of yards of concrete per project \nremember \nthere are approx 4000 lbs of materials in a yard of concrete.. \nEFTA_R1_00484009 \nEFTA01991174\n", "char_count": 1045}, {"efta_number": "EFTA01991173", "page_number": 2, "text_content": "1 grotto approx 35 yds to go \n2 flag pole road 75 yds \n3 hell road approx 40 yds \n4 triangle approx 60 yds \n5 sundial 10 yds to go \n6 Five palms 65 approx 65 yds \n7 duck bank @ five palms 80 yards + 3 truck loads of MFS sand for underground work \n8 misc pours approx 25 yds ... \nthat's all i have on the schedule for concrete placement at this time.. \nOn Wed, Feb 22, 2012 at 10:01 AM, Monique Harry \nwrote: \nI need your help. Rich wants an estimate of how many tons will go to \neach one of the projects below. 500 tons of columbian 500 tons of \nMFs and 400 tons of #57 stone. \nMONIQUE HAPPY \nProject Administrator \nLSJ, LLC \nFrom: \nSubject:\nHeavy Materia \nDate: Wed, 22 Feb 2012 09:22:58 -0500 \nTo:\nyou had asked for 500 tons of each component \ncan you please allocate estimate of use for each project \nthank you \nRichard Kahn \nHBRK Associates Inc. \nEFTA_R1_00484070 \nEFTA01991175\n", "char_count": 882}, {"efta_number": "EFTA01991173", "page_number": 3, "text_content": "On Feb 21, 2012, at 8:15 AM, Monique Harry wrote: \nCurrent Inventory: \nManufacturing Sand - 2 loads \nColumbian Sand - 1 load \nStone - 2 loads \nProjects Concrete will be used for: \n1. Five Palms - Side walks/terraces \n2. Grotto - Steps \n3. Flagpole pool - Road \n4. Hell Pad - Road \n5. Triangle - Road \n6. Sundial - Slab \nMONIQUE HARRY \nProject Administrator \nLSJ, LLC \n6100 Red Hook Qtr Suite A2-7 \nSt. Thomas, USVI 00802 \nTelephone (340) 779-8054 \nFax (340) 775-2528 \nSubject: Fwd: Heavy Material \nFrom: richardkahni2©gmail.com \nDate: Fri, 17 Feb 2012 16:01:24 -0500 \nCC: moniaueharrvfthotmail.com \nTo: bgordonisKagmail.com\nCan you please provide me with inventory currently on hand in addition to specific \ndetails on what this will be used for rather than mist island \nconcrete \nthank you \nRichard Kahn \nHBRK Associates Inc. \n301 East 66th Street, Suite 10F \nNew York, NY 10065 \ntel 646-862-4811 \nfax 646-350-0954 \ncell 917-414-7584 \nEFTA_R1_00484071 \nEFTA01991176\n", "char_count": 967}, {"efta_number": "EFTA01991173", "page_number": 4, "text_content": "From: Monique Harry \n<moniqueharry@hotmail.co \nm> \nDate: February 14, 2012 \n12:04:34 PM EST \nTo: Rich Kahn \n<richardkahn12(qmail corn \nSubject: Heavy Material \nGood Day Rich, \nAttached for your approval 3 IS) purchase request for Heavy Material \n1. Manufacturing Sand 500 tons = $26,120.00 \n2. Columbian Sand 500 tons = $40,400.00 \n3. #57 Stone 500 tons = $18,360.00 \nTotal = $84,880.00 (includes cost of Trucking) \nDue to my absence on Friday and Monday, currently 3 loads of stone \nand 3 loads of Manf. Sand is being \npick up at Heavy Material without \nfollowing the proper protocol. \nEstimated cost is $6,200.00 so, \nI'm hereby requesting $6,500.00 \nto be place on our account to \ncover the cost. \nMONIQUE HARRY \nProject Administrator \nLSJ, LLC \n6100 Red Hook Qtr Suite A2-7 \nSt. Thomas, USVI 00802 \nTelephone (340) 779-8054 \nFax (340) 779-8055 \nEFTA_R1_00484072 \nEFTA01991177\n", "char_count": 880}]}