{"efta_number": "EFTA01972795", "page_count": 2, "url": "https://epstein-data.com/EFTA01972795", "pdf_url": "https://epstein-data.com/pdf/EFTA01972795.pdf", "pages": [{"efta_number": "EFTA01972795", "page_number": 0, "text_content": "Jeffrey Epsteinlieevacation@gmail.com]: Daphne Wallace\nTo:\nFrom:\nSent:\nRoy Hodges\nWed 5/8/2013 3:48:39 PM\nSubject: Fwd: LSJ SWRO plant\nGood Morning,\nI just received the email below regarding the PH level in our water. Patrick from TSG\ncame out, inspected the RO plant and tested the water discharging out of each of the\nmembranes. He doesn't feel that it is a membrane issue. The sea water in our area\nseems to result in high PH when processed through an RO system. This has evidently\nbeen an issue from day one. There needs to be a sulphuric acid injection pump added\nin order to offset this. The high PH is most likely causing some of our rust issues and\nneeds to be resolved. The other issue is our membranes are starting to get dirty. The\nmembranes apparently have never been cleaned, so I would recommend we have them\nout to do the first cleaning. He would also like to put our system back online to allow\nremote monitoring, which I also think is a good idea. I will forward the estimate as soon\nas he gets it to me.\nThank You\nRoy\nForwarded message\nFrom: Patrick Adams ◄\nDate: Wed, May 8, 2013 at 11:27 AM\nSubject: LSJ SWRO plant\nTo:\nCc: Bob Petersen\nRoy & Stephanie,\nThank you for facilitating my arrival and departure to Little St. James island today\nto inspect the SWRO plant. Upon arrival, the plant was not running and in standby. A walk\nthrough of the plant area showed that overall, the SWRO plant has been very well\nmaintained. There were no signs of water or oil leaks, the piping was free from rust, and the\nentire SWRO plant area was clean.\nSmiley and I went over the daily data collection. In December 2012, the feed\npressure of the SWRO plant was consistently 820-830 psi. In January 2013, the daily plant\ndata clearly shows a rise in feed water pressure, and DP across the membranes indicating the\nneed for membrane cleaning. It should also be noted that the SWRO plant is producing good\nquality water that is well within drinking water quality standards. Feed water pressures have\nbeen steadily climbing over the last three to four months and are currently at 890 psi. There\nEFTA_R1_00456560\nEFTA01972795\n", "char_count": 2125}, {"efta_number": "EFTA01972795", "page_number": 1, "text_content": "is also a 50psi DP across the membranes. Membrane cleaning is absolutely necessary, and I\nsuggest that TSG be brought in to facilitate this first membrane cleaning of the SWRO plant. I\nwill send you a quote for chemical costs, and labor for cleaning.\nThere is still a post treatment issue associated with the Ph. The Ph monitor at the\nplant showed a ph of 9.6 which is extremely high. My hand held instrument showed the Ph to\nbe 8.4 which is still high, but this indicates that instrumentation calibration is needed. LSJ will\nneed to purchase calibration standards for PH (4,10, and 7 standard solutions) and\nconductivity standard solutions as well for calibrating the plant conductivity monitor. TSG\nsuggested on two other occasions that a chemical feed pump for Sulfuric acid be installed in\nthe line prior to the calcium carbonate reactor to help balance the ph to between 7 and 7.9.\nThere was an electrical connection installed for the feed pump, sulfuric acid has been\npurchased, but there is no chemical feed pump onsite that can be used for injecting sulfuric\nacid. As requested, I will get you a quote for a chemical feed pump that is compatible with\n96% acid.\nI will get your quote to you quickly. It will include all items listed here, and I\nsuggest that the chemical feed pump be installed at the same time that the membranes are\nbeing cleaned so as to save LSJ money on TSG's labor costs. There is enough down time\nduring the membrane cleaning process to have ample time available to complete the\nchemical feed pump installation in one trip. One other suggestion is to have the electrical\noutlet installed for the chemical feed pump moved to the other side of the calcium carbonate\nreactor prior to installing it. This is where the pump will be located.\nRegards,\nPatrick Adams\nUSVI Operations Manager\nOffice:\nCell:\nCell\nFax:\nRoy & Stephanie Hodges\nEFTA_R1_00456561\nEFTA01972796\n", "char_count": 1890}]}