{"efta_number": "EFTA01960366", "page_count": 3, "url": "https://epstein-data.com/EFTA01960366", "pdf_url": "https://epstein-data.com/pdf/EFTA01960366.pdf", "pages": [{"efta_number": "EFTA01960366", "page_number": 0, "text_content": "To:\nFrom:\nSent:\nJeffrey Epstein[jeevacation@gmail.com]\nDaphne Wallace\nMon 8/5/2013 10:25:44 PM\nSubject: Re:\nGreetings Sir,\nI will pursue Florida. Jimmy is already doing so, he has called two of his contacts in the Miami\narea for recommendations.\nJimmy says once the permit is obtained, 4 days to form the road, 2-3 days to pour - a total of 6-7\ndays. If he has to get the concrete trucks one at a time, it may take a little longer, but 10 days is\nthe extreme worst case scenerio.\nRespectfully,\nDaphne\nOn Mon, Aug 5, 2013 at 5:15 PM, Jeffrey Epstein <jeevacation@gmail.com> wrote:\nthere are many steel co fro hangarss, check, florida... how long will road take after reciving\napproval?\nOn Mon, Aug 5, 2013 at 11:27 AM, Daphne Wallace\nGreetings Mr. Epstein,\nwrote:\nJimmy is still planning to begin working on LSJ week of 8/19. He is so far on schedule to\nconclude his other projects on St. Thomas, so barring weather, he will be starting with the tile\nwork week of 8/19.\n1. Tile work - the tiles are scheduled to arrive at the port in DR on 8/15. EDA to sail from\nSanto Domingo is 8/22, EDA on STT 8/24, will can clear and pick up on 8/26. This schedule\nis perfect for Jimmy, who anticipates that the slab pour for the tile will take 6-7 days, and\nafter that the tiler comes in and he will take approximately 2 weeks. The thinset will be on\nSTT on 8/10, Jimmy gave me the parts order for the pool drain this morning, I sent the quote\nto Jimmy to confirm it has everything, and will order once he confirms today. The grout will\nbe purchased locally, I will call Floor Factory to reserve the quantity once Jimmy gives it to\nme this week. Jimmy says this project, barring weather, is still estimated at 3 weeks.\n2. Gym road-spoke with the surveyor this morning. They should have the drawings this week.\nJimmy has offered to push through the application with his contacts at DPNR, we just have\nto get the application in order. I am reaching out to John at Jaredian Design for guidance.\nJimmy says he can still begin the prep work for the road pour once he is on site, in\nanticipation of the permit coming through. Still scheduled to do the road work along with\nthe tile work, barring weather, and any permitting delays.\nEFTA_R1_00434597\nEFTA01960366\n", "char_count": 2244}, {"efta_number": "EFTA01960366", "page_number": 1, "text_content": "3. Five Palms Dome - Samson broke the quote out - Materials $7,845 (nuts, bolts, framing\naluminum, plate and shipping costs associated with constructing and installing the dome) and\nLabor $8,640 (3 men @ $90/per hr @ 8 hrs/day @ 4 days). Jimmy will call Samson to\ndiscuss. There is no start date for this project.\n4. Main Entrance - Jimmy and the masons plan to come to LSJ on Wednesday morning for a\nsite visit so they can discuss options of stone for your review. There is no start date for this\nproject.\n5. Waterfall - Jimmy needs advisement on what you would like for the waterfall. There is no\nstart date for this project.\n6. Tennis court - There is no start date for this project.\n7. New garage for Mechanical area- Jimmy needs advisement on location and dimensions so\nwe can seek a quote. There is no start date for this project.\n8. New hangar - Jimmy and I have had no success with Capitol Steel Structures, so Jimmy is\ncalling his contact in Texas, and I will follow up to get them the specs for the building. There\nis no start date for this project.\nRespectfully,\nDaphne\nOn Sun, Aug 4, 2013 at 8:27 AM, Jeffrey Epstein <jeevacation@gmail.com> wrote:\nequipment?\nreal schedule for jimmys work, start date finish.etc\nThe information contained in this communication is\nconfidential, may be attorney-client privileged, may\nconstitute inside information, and is intended only for\nthe use of the addressee. It is the property of\nJeffrey Epstein\nUnauthorized use, disclosure or copying of this\ncommunication or any part thereof is strictly prohibited\nEFTA_R1_00434598\nEFTA01960367\n", "char_count": 1583}, {"efta_number": "EFTA01960366", "page_number": 2, "text_content": "and may be unlawful. If you have received this\ncommunication in error, please notify us immediately by\nreturn e-mail or by e-mail to jeevacation@gmail.com, and\ndestroy this communication and all copies thereof,\nincluding all attachments. copyright -all rights reserved\nThe information contained in this communication is\nconfidential, may be attorney-client privileged, may\nconstitute inside information, and is intended only for\nthe use of the addressee. It is the property of\nJeffrey Epstein\nUnauthorized use, disclosure or copying of this\ncommunication or any part thereof is strictly prohibited\nand may be unlawful. If you have received this\ncommunication in error, please notify us immediately by\nreturn e-mail or by e-mail to jeevacation@gmail.com, and\ndestroy this communication and all copies thereof,\nincluding all attachments. copyright -all rights reserved\nEFTA_R1_00434599\nEFTA01960368\n", "char_count": 897}]}