{"efta_number": "EFTA01849182", "page_count": 2, "url": "https://epstein-data.com/EFTA01849182", "pdf_url": "https://epstein-data.com/pdf/EFTA01849182.pdf", "pages": [{"efta_number": "EFTA01849182", "page_number": 0, "text_content": "Punch List - per JE directives as of December 20, 201Chillax room - motion detector switch - should only have\none light switch - Gary Moses\n2. 5. Flagpole pool\n-Take the pool cleaners out\n- Scuppers are either rusted or broken - please send photo to Bart\n6. Chillax room - red and blue rug to be tried - the pillows may be the source of the smell\n7. Banquette - two tree lights near banquette\n8. Gym\n-Gutter is leaking in the front\nPunch List - per JE directives December 2, 2011\n13. Flagpole bath and cabana - refrigerator 24\" wide, 23\" deep, stainless steel, and door swing on right - Brice\nordered-robe hook outside shower-pool pump insulation for domestic fresh water distribution pump on\norder-walkway gates schedule - Bill\n6. Electrify info center\n7. Five Palms - JE approved height-Tom - two high windows\n8. Grotto\n9. Heli wall\n13. Big wind doors lighting - 2 recessed ceiling lights centered on each side of the doors-set on sconce timer\n15. St. John terrace-change lights\n16. Hangar -floor sanding in progress - 40'X50' area for slab, 3 foot wall around it - containment for ISO fuel\ntank-bathroom and room divider\n17. Plants bought from Italian woman\n18. Steel shed for the new workshop area\n19. Triangle\n20entry tree lights\n21. Solar fridge, light, fan for pebble beach\n22. Humidifiers - Atlanta Refrigeration speaking to Trane - date?\n24. Yellow flowering Alamandra up Old Mill wall and Flagpole hill\n25. Beach 3-containers into back of hill - Peter to grade out\n27. Solutions for generators - no provisions for sound dampening - design fault-Maguire contract will be\nemailed to Gary, Tom, Darren, Brice for research into the matter - Brice adjusted shutter\n28. Fire system - not working, Brice creating fire charts for the island\n29. Top of hill - CLEAN UP - place garbage in circle - build up 10 feet - new helipad\n30. Pool - tiled - Bart - JE selected - LSJ orders - Brice to find out Bart's schedule\n31. Library windows - K&S researching stainless steel alternatives, or could fabricate 2 windows-hinge open,\nbolt latch, weather stripped\n33. Nursery - completely cleared out of plants by 11/30 - use only for flower production for the rooms\n34. Greenhart wood-steps to Grotto\n35. Five Palms floor\n36. Five Palms doors location\n37. St. John terrace lights\n3839. Pool equipment and insulation\n40. Pool - redo\n41. Tree transplants\n43. Guestroom door knobs\n44. Tiki-shields and kitchen - stainless cabinets from American Export sailing 12/2, EDA 12/\n45.flagpole pool rug, ]\npool heater rooms.\nSunken garden berm\nConcrete roads at flagpole,\nEFTA_R1_00241087\nEFTA01849182\n", "char_count": 2582}, {"efta_number": "EFTA01849182", "page_number": 1, "text_content": "Conrete triangle.\nCompass, grotto, pebble beach,\nBench placements.\nLibrarby windows resealed.\nGym gutter corner\nCabana 1 roof\nMaster bed roof screw replace\nEngineering cleaned and new steel building\nNew vehicles\nPaint ballet and yoga room\nEFTA_R1_00241088\nEFTA01849183\n", "char_count": 269}]}