{"efta_number": "EFTA01845274", "page_count": 1, "url": "https://epstein-data.com/EFTA01845274", "pdf_url": "https://epstein-data.com/pdf/EFTA01845274.pdf", "pages": [{"efta_number": "EFTA01845274", "page_number": 0, "text_content": "VIRGIN ISLAND GUNITE POOLS\nSt. Thomas ⚫U.S. Virgin Islands\nPhone:\nProposal submitted to:\nName: LSJ, LLC\nStreet: 6100 Red Hook Quarter Ste. B3\nCity: St. Thomas\nState: U.S.V.I.\nOctober 24, 2011\nChange Order #11\nWork to be performed at:\nLittle St. James\nMain Compound Pool #1011\nZip: 00802\nPhone:\nEmail:\nWe hereby propose to supply all the labor for the installation of all tile (1x1) to the existing pool. LSJ to furnish all materials.\nBelow is a scope of work:\n-\nSawcut below waterline tile\n-\n-\n-\n-\n-\nChip off all waterline tile\nChip around all wall fittings, main drains, and below waterline tile\nAcid wash all existing Diamond Brite plaster\nRe-mud in all areas chipped out to level back up\nThin set new tile to existing mortar work and Diamond Brite\nGrout all new tile work\n- Lightly acid wash all new tile work for polishing\n- Install all new Grey main drains and wall fittings\n-\nFill pool and LOVE IT!!!!\nBelow is a list of materials needed for the above referenced scope of work. All materials are to be supplied by LSJ:\n-3,000 sq. ft. of tile\n-90 bags of 918 thin set\n- 5 gallons of blue pigment\n10 gallons of bonder\n5 bags of lime\n12 bags of common cement\n- sand\nAll material is guaranteed to be as specified, and the above work to be performed in accordance with the drawings and specifications submitted for above\nwork and completed in a substantial workmanlike manner for the sum of:\n$ 42,600.00 - Forty two thousand six hundred dollars.\nWith payments to be made as follows:\n$20,000.00 due upon move-in\nBalance due upon completion\nAny alteration or deviation from above specifications involving extra costs will be executed only upon written orders and will become an extra charge over and above the estimate.\nAll agreements contingent upon strikes, accidents, or delays beyond our control. Homeowner to carry fire, tornado, and all other necessary insurance upon above work.\nRespectfully Submitted:\nPer: Bart Wolterman\nNote: This proposal may be withdrawn by us if not accepted within 30 days.\nACCEPTANCE OF PROPOSAL\nThe above prices, specifications, and conditions are satisfactory and are hereby accepted. You are authorized to do the work as\nspecified. Payment will be made as outlined above.\nDate\nSignature\nEFTA_R1_00234274\nEFTA01845274\n", "char_count": 2251}]}