{"efta_number": "EFTA01828680", "page_count": 2, "url": "https://epstein-data.com/EFTA01828680", "pdf_url": "https://epstein-data.com/pdf/EFTA01828680.pdf", "pages": [{"efta_number": "EFTA01828680", "page_number": 0, "text_content": "To:\nDoug Schoettle[\nFrom:\nJeffrey Epstein\nSent:\nWed 6/17/2009 6:59:38 PM\nSubject: Re: FW: Conduit Bank Approval.\nok\nOn Wed, Jun 17, 2009 at 2:47 PM, Doug Schoettle\nwrote:\nJeffrey, I recommend that the electrical and technology conduit bank that was\ninstalled under the concrete plant be extended to the new electrical building at this\ntime. A trench is being dug for the extension of the under sea power cable to the\nelectrical building, now is the time to install the extra conduit in the same trench.\nRegards, Doug\n---On Wed, 6/17/09, Brice Gordon\nFrom: Brice Gordon\nSubject: FW: Conduit Bank Approval.\nTo: \"Doug Schoettle\" <\nDate: Wednesday, June 17, 2009, 3:19 PM\nDoug,\nFYI Brice\n------ Forwarded Message\nFrom: J Epstein <jeevacation@gmail.com>\nDate: Wed, 17 Jun 2009 13:56:32 -0400\nTo: Brice Gordon <\nSubject: Re: Conduit Bank Approval.\nthis is a doug issue\nOn Wed, Jun 17, 2009 at 2:04 PM, Brice Gordon\nwrote:\n> wrote:\nTo: JEE\nAttached is a proposal for a 250ft extension of the 10 Pipe Conduit bank to\nthe new Electrical building.\nAfter reviewing with Tom and Doug, I would like to submit the above\nproposal for your review/approval\nThe first leg was installed (early 2006) prior to cement plant installation\nTom is now trenching for the new electrical supply to mechanical building.\nProposed 10 pipe Conduit bank is for the future build out of the existing\ncompound and if this work is not performed at this time we are effectively\nabandoning existing Conduit bank.\nEFTA_R1_00204196\nEFTA01828680\n", "char_count": 1504}, {"efta_number": "EFTA01828680", "page_number": 1, "text_content": "Amount: $21,610.00\nBrice\nEnd of Forwarded Message\nEFTA_R1_00204197\nEFTA01828681\n", "char_count": 80}]}