{"efta_number": "EFTA01804643", "page_count": 3, "url": "https://epstein-data.com/EFTA01804643", "pdf_url": "https://epstein-data.com/pdf/EFTA01804643.pdf", "pages": [{"efta_number": "EFTA01804643", "page_number": 0, "text_content": "From:\nSent:\nTo:\nSubject:\nRichard Kahn\nSunday, May 1, 2016 8:58 PM\nJeffrey Epstein\nFwd: Great St James\nSent from my iPhone\n=br>Begin forwarded message:\n=rom: Hugo Hodge\nDate: May 1, 2016 at 4:33:39 PM EDT\nTo:<=b> Richard Kahn\nSubject: Re: Great St James\nNo Sir, $5k of each option. That means $80k-$5k for a total of $75k for the all inclus-ve scope and\n$72k-$5k for a total of $67k for the reduced scope.\nOn Sun, May 1, 2016 a= 3:52 PM, Richard Kahn\nwrote:=br>\nif I understand corre=tly you will do the entire program minus the complete as builts and\ninstall-tion witness for 72k less 10k = a total of 62k\nDate: Sunday, May 1, 2016 at 3:09 PM\nTo: Richard Kahn\n><=r>Subject: Re: Great St James\n<=span>\noff each option.\nGood afternoon Mr. Kahn,\nWhile I must r-iterate that u strongly suggest the option for the entire proposal,I can ta=e $5k\nOn May 1, 2016, at 1:55 PM, Richard Kahn\nwrote:\n=div>\nmy client is very island centric. no insult meant at all, and i apologiz= if you felt\nslighted. can you give me your best and final price so tat i may once again review all alternatives and then prepare one\nfinal appl=s to apples analysis. Thank you.\nRich\n1\nEFTA_R1_00150286\nEFTA01804643\n", "char_count": 1182}, {"efta_number": "EFTA01804643", "page_number": 1, "text_content": "Sent from my iPhone\nOn Apr 30, 2016, at 8:=8 PM, Hugo Hodge\nwrote:\nWith the greatest respect for you and your client, I'm sorry but HKT will have to\nrespectfully decline to accommodate that off=r.\nApparently you have someone off island, u-aware of the local requirements and\nhopefully the cost you are expecting to pay will not increase when they acquire that knowledge.\n$50k is more than 50% below the proposal and, for lack of better words= quite\nunacceptable and insulting.\nShould you run into difficulties with your other option HKT stands prepared to\ndeliver first-class results as described in our written and verbal communication.\nOn Apr 30, 2016, at 4:04 PM, Richard Kahn\nwrote:=br>\nThank you for your email. as i told you when we s=oke last week I have a bid for\n40k. my instructions are to source locally if i can and save travel costs. I will increase my o=fer to you and for 50k we\ncan proceed with your proposal. amy dempse= is being retained for routing.\nThank-you.\nRichard Kahn\nHBRK Associates Inc.\nTel\nFax\nCell\nwrote:\nGood morning Mr.Kahn=\nI have thoroughly reviewed your suggestions for m=difications to the bid and\ngiven your request great consideration. I honest-y believe that the items you requested are important for a successful\nproje=t. For example, the witnessing of the factory acceptance is not a step I would recommend omitting.\nWith that said, the items you suggested to remove total $23,000. To ensure the\nintegrity of this projec= I am willing to do the project with the entire scope at the original price-less $23,000 for a total\nof $80,000. If you decline this option and are con-inced that these items should be omitted, I am willing to reduce the\nremain ng items by 10% resulting in a cost of $72,000 for the revised scope.\n2\nEFTA_R1_00150287\nEFTA01804644\n", "char_count": 1791}, {"efta_number": "EFTA01804643", "page_number": 2, "text_content": "this further with you if necessary.\nI strongly recommend you consider the first option but I am willing to discuss\nBest Regards,\nHugo Hodge Jr\nOn Thu, Apr 28, 2016 a= 12:32 PM, Richard Kahn\nwrote=\nit wa= a pleasure speaking with you earlier. as discussed the following are=s are\nscopes that will not be needed and my comments:\nrevisit pricing\ndevice - ok to k=ep - please revisit pricing\nok to keep - please r=visit pricing\na) conceptual design on cable routes - ok to keep - please revisit pri=ing\nb) detailed cable specs and preparation of bid docs -&nbs=;ok to keep - please\nc) detailed switch an= meter design and prep of all switches and metering\nd) review all switch and cable bi= submittals and submit to Wapa for approval -\ne) witness factory acceptance test - not necessary as all we need is for you to\nreview test from manufacturer and should-be included in d) above\nplease revisit pricing</=>\nback from you this afternoon\nf) complete final design to include c=vil and electrical drawings - ok to keep -\ng) witness installation and test electrical devices - not ne=ded\nh) complete as builts - not needed\ni appreciate your effort in revisiting your pricing and look forward to hearing\nthank you\nRichard Kahn\nHBRK Associates Inc.\ntel\nfax\ncel\n3\nEFTA_R1_00150288\nEFTA01804645\n", "char_count": 1282}]}