{"efta_number": "EFTA01367380", "page_count": 1, "url": "https://epstein-data.com/EFTA01367380", "pdf_url": "https://epstein-data.com/pdf/EFTA01367380.pdf", "pages": [{"efta_number": "EFTA01367380", "page_number": 0, "text_content": "31 May 2015\nIntegrated Oil\nUS Integrated Oils\nPrimary Growth Drivers\nVolume growth will be chiefly driven by managing declines at various mature\nfields in West Siberia and a handful of moderately-sized project start-ups in the\nTiman-Pechora (Trebs and Titov), Sakhalin (Arkutun-Dagi), and North Caucasus\n(Vladimir Filanovski) basins. In total we estimate growth projects to grow-term\nnear-term production of ~120 Mb/d (2016 vs. 2014)\nPrimary Risks\nIn our view, the key risk to near-term production growth/sustainment involves\nmitigating against declines in West Siberia. In our view, improvements in\noperator execution as well as cheap funding from a weakened Ruble will\nbroadly keep production flat through 2020.\nDecline Mitigation: Exiting 1015 development drilling was up 17.5% YoY and\nthe well count increased by 17%, despite the bottoming of the commodity on\nbetter execution from operators and tail-winds from cheaper Ruble-\ndenominated spend. Russian oil companies have broadly spoken to flat or\nmodestly higher capital spending in 2015 (in RUB). The Russian government\nrecently granted a Mineral Extraction Tax (MET) break and a reduced Export\nDuty rate which may ultimately further costs for operators (and incentivize\ndrilling activity). Given the large size of the production base, a shift of 1% in\nthe forecasted decline rate for Russia results in a significant adjustment to our\ncall on US onshore growth (~300 Mb/d in our 2017 call on US onshore\ngrowth.)\nFigure 124: Key Growth Projects, 2014-2020\n/\nProject\nIEA\nRegion\nProduction\n2014-2017\n2014-2020\nCountry\nSector\nSeverEnergia\nFSU\nRussia\nSrednebotuobinskoye\nFSU\nRussia\nWest Siberia\nEast Siberia\nYarudeiskoye\nrsu\nRussia\nWest Siberia\nOperator\nSeverEnergia\nTaas-Yuryakh\nYargeo\nProject Type\nDev Status\nAPI\nPeak Prod Yr\nStart Up Yr\nProd\nProd\nOnshore\nOnstream\n43\n2012\n2018\n120\n122\nOnshore\nOnstream\n32\n2013\n2023\n85\n112\nOnshore\nUnder Development\n42\n2015\n2016\n79\nTalakan Fields\nFSU\nRussia\nEast Siberia\nTalakannet\nOnshore\nOnstream\n35\n1989\n2017\nYaregskoye (LUKOIL)\nFSU\nRussia\nTiman-Pechora\nLUKOIL-Komi (Yareganeft)\nOnshore\nOnstream\n21\n1939\n2017\nSuzunskoye\nFSU\nRussia\nEast Siberia\nVankorneft\nOnshore\nUnder Development 41\n2016\n2018\n30\nTrebs and Titov\nFSU\nRussia\nPriraziomnoye (TP)\nFSU\nRussia\nNovoportovskoye\nFSU\nRussia\nTiman-Pechora\nTiman-Pechora\nWest Siberia\nBashneft-Polus\nOnshore\nOnstream\n2013\n2021\nGazprom neft shelf\nShallow\nOnstream\n24\n2013\n2021\nGazpromneft Novi Port\nSakhalin-1 Area\nFSU\nRussia\nFar East\nExxonMobil\nOnshore\nShallow\nOnstream\n32\n2011\n2022\n28\nOnstream\n32\n2005\n2025\n28\nSource: Deutsche Bank. Wood Mackenzie\nPage 62\nCONFIDENTIAL - PURSUANT TO FED. R. CRIM. P. 6(e)\nCONFIDENTIAL\nDeutsche Bank Securities Inc.\nDB-SDNY-0058913\nSDNY_GM_00205097\nEFTA01367380\n", "char_count": 2722}]}