{"efta_number": "EFTA01367373", "page_count": 1, "url": "https://epstein-data.com/EFTA01367373", "pdf_url": "https://epstein-data.com/pdf/EFTA01367373.pdf", "pages": [{"efta_number": "EFTA01367373", "page_number": 0, "text_content": "31 May 2015\nIntegrated Oil\nUS Integrated Oils\n☑\nPrimary Growth Drivers\nNear-term volume growth will be driven by recent discoveries off Sabah which\nhave extended the eventual drop-off from Kikeh to 2017. In the near-term\n(2014-2017) we anticipate oil production to increase 9% by 2017 to 670mboe/d\ndriven exclusively by the deepwater fields off Sabah. However, with Sabah\nexpected to peak production in 2017 and anticipated lower levels of\nexploration over the next several years, growth visibility in the region post\n2017+ is limited.\nPrimary Risks\nIn our view, the primary risk associated to the oil production outlook is a\nlonger-term depletion of its mature asset base. From 2010-2014 exploration\nactivity has dropped significantly with annual exploration wells completed\naveraging only 11 vs. 16 during the 2003-2009 time-frame with commercial\nwells representing 24% and 40% of the mix respectively. While total\n(commercial and technical) resource discovered per well has been significant\n(-33 mmboe/well) over the last 5 years the commerciality of the discovered\nresource has fallen off. From 2000-2010 commercial reserves made up -2/3 of\nthe discovered resource; however, that figure has averaged -1/3 over the last\n4 years and reached an all time low in 2014 of 8%.\nFigure 105: Exploration activity has dropped over the last\n5 years\n50\nFigure 106: Even though resource per well metrics are\nmore constructive, only 33% of the discovered reserves\nover the last 4 years are considered 'commercial'\n1400\n# of Wells Completed\n10\n5\n0\n45\n40\n35\n52%\n2003 2004 2003 200\nAppraisal\nExploration Commercial\nSource: Deutsche Bank, Wood Mackenzie\n75%\n65%\n1200\n55%\n1000\n45%\n35%\n800\n24%\n25%\n600\n18%\n15%\n13%\n15%\n400\n5%\n5%\n200\n-5%\n2009\n2010\nwwwwwwwwExploration Technical\n--Comm % of Total Exp Wells\n2011\n2012\n2013\n2014\nFigure 107: Key Growth Projects, 2014-2020\n0\nساء\n2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014\nExploration Technical\nExploration Commercial\nSource: Deutsche Bank, Mackenzie\nProject IEA Region\nCountry\nSector\nOperator\nProject\nType\nProd Start\nPeak\n2014-2017 2014-2020\nDev Status\nΑΡΙ\nUp Yr\nProd Yr\nProd\nProd\nSBJ\nAsia\nMalaysia\nSabah\nShell\nDW\nOnstream\n40\n2012\n2015\n59\n40\nSBK\nAsia\nMalaysia\nSabah\nMurphy Oil\nDW\nOnstream\n37\n2007\n2021\n33\n32\nSB G\nAsia\nMalaysia\nSabah\nShell\nDW\nOnstream\n35\n2014\n2022\n20\n20\n50\nWakid\nAsia\nMalaysia\nSabah\nPetronas Carigali\nDW\nGood Technical\n35\n2019\n2020\n18\nSource: Deutsche Bank, Wood Mackenzie\nDeutsche Bank Securities Inc.\nCONFIDENTIAL - PURSUANT TO FED. R. CRIM. P. 6(e)\nCONFIDENTIAL\nPage 55\nDB-SDNY-0058906\nSDNY_GM_00205090\nEFTA01367373\n", "char_count": 2579}]}