{"efta_number": "EFTA01367366", "page_count": 1, "url": "https://epstein-data.com/EFTA01367366", "pdf_url": "https://epstein-data.com/pdf/EFTA01367366.pdf", "pages": [{"efta_number": "EFTA01367366", "page_number": 0, "text_content": "31 May 2015\nIntegrated Oil\nUS Integrated Oils\nPrimary Growth Drivers\nNear-term oil production growth will be challenged as most mega project\nstarts and expansions (Kashagan restart expected mid 2017 with Tengiz and\nPearl contributions anticipated post 2020) are anticipated later this decade.\nWe model a 2.5% decline rate for the base assets; as recent investment in\nrecovery methods in ACG (Chirag Oil Project) and in Tengiz (Capacity and\nReliability project) are expected to partially offset declines.\nPrimary Risks\nIn our view, the primary risks to the 2015-2020 production outlook for the\nCaspian Sea include delays to unsanctioned projects amid lower crude prices\nas well as increased operational delays associated with the restart of the\nKashagan oil field.\n1. Delays to Unsanctioned Projects: The region's most capital-intensive\nproject is Tengiz (Wood Mackenzie estimated peak production of\n-240 mbpd aggregate for the WPMP and FGP projects) at -$37 Billion.\nLocal content requirements and high export taxes delayed the\nscheduled FID from 2014 to 1H2015 yet with only 10% of the project's\nrequired capital invested as of YE14, there is significant risk to further\nproject slippage. Woodmac anticipates a further delay in FID to 4Q15\nwith first oil production at FGP not expected until 2021 vs. the initial\n2017 target date. FID decisions surrounding Kashagan Phase II (est\npeak production of 630 mbpd in 2030) and Pearls (est peak production\nof 50 mbpd in 2024) do not impact our forecast window but will have\nan impact on production sustainability in the country.\n2. Operational Delays to the Restart of Kashagan: Operational-related\ndelays to the restart of the Kashagan oil field) would represent another\nmaterial risk in the outlook (with -$50Bn in sunk costs, the project is\nnot materially levered to lower crude prices). Following the start of\nPhase One in September of 2013, the field was soon shut-in following\nleaks in the gas pipelines that carried sour gas onshore. Following a\nfull replacement of the oil and gas pipelines production is expected to\nramp to -400 mboe/d. Completion of pipeline replacement work is\ntargeted for 2H2016 with Wood Mackenzie anticipated first oil\nproduction by mid-2017, reaching -300 mboe/d by 2019.\nFigure 87: Key Growth Projects, 2014-2020\n/\nProject\nA Region\nCountry\nSector\nOperator\nProject Type\nDev Status\nAPI\nProd Start Up Yr\nPeak Prod Yr\n2014-2017 Prad 2004-2020 Prod\nKashagan Contrad Area\nCheleken Contract Area\nFSU\nKazakh\nOffshore\nNorth Caplan Operating Co\nShallow\nOnam\n2013\nTurkmenistan\nSouth Caspian Basin\nDragan Oil\nShallow\nDream\n34\n1972\n2021\n17\nGen Der Bahar\nFSU\nAzerbaijan\nAzerbaijan Offere\nBahar Energy Operating Company\nShallow\nOmdream\n1965\n3021\n7\nUnid\nFSU\nAzerbaijan\nAzerbaijan Offshore\nSOCAR\nShallow\nOmstream\n40\n2012\n2122\n3\nShah Den\nPSU\nAzerbaijan\nAzerbaijan Offshore\nShallow\nOtam\nP\n2006\n2022\nTengahevroll Area\nFSAJ\nKarakhstan\nPrecaspian Basin\nTengahevrol\nOnshore\nOndream\n47\n1990\n3023\n2\nF\nPrecaspian Ban\nGovenment of Kazakhstan\nOnshore\nOndream\n1901\n3022\nSource: Deutsche Bank, Wood Mackenzie\nPage 48\nCONFIDENTIAL - PURSUANT TO FED. R. CRIM. P. 6(e)\nCONFIDENTIAL\nDeutsche Bank Securities Inc.\nDB-SDNY-0058899\nSDNY_GM_00205083\nEFTA01367366\n", "char_count": 3203}]}