{"efta_number": "EFTA01367361", "page_count": 1, "url": "https://epstein-data.com/EFTA01367361", "pdf_url": "https://epstein-data.com/pdf/EFTA01367361.pdf", "pages": [{"efta_number": "EFTA01367361", "page_number": 0, "text_content": "31 May 2015\nIntegrated Oil\nUS Integrated Oils\nPrimary Growth Drivers\nVolume growth from 2015-2020 is primarily driven by the continued\ndevelopment of Pre-Salt resource in the deepwater Santos and Campos Basins.\nIn particular, near-term volume growth is expected to come from the start of\nFPSOS in the Buzios and Lula/Iracema development. Development at Lula-\nIracema (the largest driver of growth through 2017) entails a total of 10 FPSOs\n(8 in Lula, 2 in Iracema). 3 FPSOs are currently in operation and 7 additional\nFPSOS will be required for development (150 Mb/d of capacity each), 4 of\nwhich are replicant FPSOS being constructed in Brazil.\nPrimary Risks\nProject execution, already problematic in recent years given the combination of\ntechnical challenges and local content requirements, have become particularly\nacute given the collapse in oil price and corruption scandal affecting both\nPetrobras and the Brazilian government. We see two primary risks:\n1. Weak oil price and uncertain investment environment could impact\ninvestment in the base (ie. maintenance capital), increasing the\nunderlying decline at the 2.4 MMb/d of current production. We see\nthis risk as slightly less acute than some basins heavily dependent on\nmaintenance/infill capital spend (ie. UK North Sea/Norway), however\nevery 1% increase in underlying decline above our 8%/yr base case\nwould reduce 2017 production by 40 Mb/d.\n2. Delays to FPSO start-ups. We see a high likelihood of material delays\nin the start-ups of future FPSOS, particularly the 4 replicant FPSOS\nbeing constructed in Brazil with targeted start-ups in 2017-2018 (Lula\nSouth, Lula North, Lula Extension, and Lula West - P-66, P-67, P-68,\nP-69). We have risked project starts in proportion to local content\nrequirements (Buzios, Taratuga Verde), assuming an average 2-year\ndelay in targeted first oil. We model an estimated -225 Mb/d of\nincremental production through 2017 from the arrival of 4 FPSOS\nthrough (2 in each 2016 and 2017); the modeled production\ncontribution increases to over 900 Mb/d by 2020.\nFigure 76: Key Growth Projects, 2014-2020\nProject\nIEA Region Country\nSector\n☑\nOperator\nProject Type\nDev Status\nAPI\nProd Start Up Peak Prod Yr\n2014-2017 Prod 2014-2020 Prod\nYr\nLala-Iracema Latin America\nBrazil\nSantos\nPetrobras\nUDW\nOnstream\n27\n2009\n2022\n381\nSapinhoa\nLatin America\nBrazil\nSantos\nPetrobras\nUDW\nOnstream\n30\n2010\n2016\n171\n171\nPapa-Terra Latin America\nBrazil\nCampos\nPetrobras\nDW\nOnstream\n14\n2013\n2017\n96\n55\nRoncador\nLatin America\nBrazil\nCampos\nPetrobras\nUDW\nOnstream\n24\n1999\n2018\n79\n55\nFrade\nLatin America\nBrazil\nCampos\nChevron\nDW\nOnstream\n20\n2009\n2017\n54\n15\nCachalote\nLatin America\nBrazil\nCampos\nPetrobras\nDW\nOnstream\n24\n2008\n2018\n32\n12\nProbable\nBS-4\nLatin America\nBrazil\nSantos\nQueiroz Galvao\nUDW\nDevelopment\n34\n2016\n2019\nLapa\nLatin America\nBrazil\nSantos\nPetrobras\nUDW\nOnstream\n26\n2011\n2020\n20\n28\na\nBuzios\nLatin America\nBrazil\nSantos\nPetrobras\nUDW\nUnder Development\n28\n2016\n2023\n300\nlara\nLatin America\nBrazil\nSantos\nPetrobras\nUDW\nUnder Development\n26\n2018\n2026\n°\n50\nSource: Deutsche Bank, Wood Mackenzie\nDeutsche Bank Securities Inc.\nCONFIDENTIAL - PURSUANT TO FED. R. CRIM. P. 6(e)\nCONFIDENTIAL\nPage 43\nDB-SDNY-0058894\nSDNY_GM_00205078\nEFTA01367361\n", "char_count": 3218}]}