{"efta_number": "EFTA01367359", "page_count": 1, "url": "https://epstein-data.com/EFTA01367359", "pdf_url": "https://epstein-data.com/pdf/EFTA01367359.pdf", "pages": [{"efta_number": "EFTA01367359", "page_number": 0, "text_content": "31 May 2015\nIntegrated Oil\nUS Integrated Oils\nPrimary Growth Drivers\nNear-term production growth will be supported by several project start-ups.\nThe recent (and worth noting 'on schedule') starts of the Kizomba Satellites\nPhase 2 and Block 15/06 West Hub Development projects in 2015 are the\nchief drivers of 300 mbpd of crude growth through 2017. The long-term\nproduction outlook will be driven by the ramp from fields in the Kaombo Block\n32, and contributions from currently unsanctioned projects (Cameia).\nPrimary Risks\nGeopolitical risks withstanding, the key risks to production in our forecast\nwindow include a delay to project start-ups particularly the ramp from the\nBlock 32 fields (projected on stream in 2017), and the delayed sanctioning of\nseveral projects including the high profile Cameia project (anticipated late 2015\nFID with peak oil production by 2018 of 80 mbpd).\nProject Delays: Through 2017, primary risk is in delays to the starts of two\nkey projects: Block 15 NE Hub and the Kaombo Block 32. Although largely\nin process, there could be limited risk of delays associated with cost\nreduction efforts in the current environment. Incremental production from\nthe Kaombo fields in Block 32 (2017 target project start) is expected to\nreach a peak capacity of 230 mbpd by 2020. Deep water depths,\ndispersion of fields, and high presence of salt imaging has the potential for\nincreased technical risks.\nSanction Delays: Including Cameia unsanctioned projects represent nearly\nall the incremental crude production from 2017 to 2020. Cost reduction\nwill be a significant driver of accelerated FID activity; Cobalt is currently\nestimated Cameia YE15 sanction on estimated development costs of\n<$20/bbl and assumed $2Bn in estimated cost savings.\nFigure 71: Key Growth Projects, 2014-2020\n☑\nProject\nIEA Region\nSector\nBasin\nAfrica\nDeepwater\nOperator\nExxonMobil\nProject Type\nDev Status\nAPI\nProd Start Up Yr Peak Prod Y\n2014-2017 Prod\n2004-2020 Prod\nDW\nUnder Developesent\n2x5\n2005\n2020\n106\n177\nBlock 15/06 NW Hub\nAfrica\nDeepwater\nLower Congo\nBe\nDW\nOnstream\n236\n2014\n2016\n83\nMineira\nAfica\nOffshore Cabinda\nChewron\nShallow\nDestream\n3109\n2018\nBlock 32 Kambo\nAfrica\nUltra Deepwater\nLower Congo\nTotd\nUDW\nUnder Developesent\n32\n2017\n2009\n40\n214\nBed 15/06\nDeepwater\nLowe Cango\nTHE\nDW\nUnder Developese\n34\n3006\n2018\n39\n67\nBlock 21\nAfrica\nDeepwater\nEwarza\nCobalt International Energy\nLIDW\nUnder Developesent\n\"\n2017\n2024\n10\n100\nBlack 18 West\nAca\nDeepwater\nB\nUDW\nProbable Development\n32\n2019\n2005\nD\n45\nBlock 31 Southeast\nAfrica\nUltra Deepwater\nLower Congo\nUDW\nProbable Development\n325\n2020\n2022\nD\nBlekk 32 Cemal NE\nUltra Deepwater\nLower Cargo\nUDW\nProbable Development\n2030\n2002\nD\nOrca\nAfrica\nDeepwater\nEwanza\nCobalt International Energy\nDW\nProbable Development\n2020\n2022\n°\n22\nSource: Deutsche Bank, Wood Mackenzie\nDeutsche Bank Securities Inc.\nPage 41\nCONFIDENTIAL - PURSUANT TO FED. R. CRIM. P. 6(e)\nDB-SDNY-0058892\nCONFIDENTIAL\nSDNY_GM_00205076\nEFTA01367359\n", "char_count": 2956}]}