{"efta_number": "EFTA01367337", "page_count": 1, "url": "https://epstein-data.com/EFTA01367337", "pdf_url": "https://epstein-data.com/pdf/EFTA01367337.pdf", "pages": [{"efta_number": "EFTA01367337", "page_number": 0, "text_content": "31 May 2015\nIntegrated Oil\nUS Integrated Oils\nFigure 32: Near-Term FID Tracker\nPeak O\nProduction\nCommentary\nPan for Development and Operation (POO) was submitted for Phase 1 (capacity of\n315-320 Mad between 315-380 Mods in February. Will consist of bridge-linked platforms and subse\nwater injection templates\nConcept is to connect to use subsea tieback to connect to current infrastructure. Plan for\nDevelopment and Operation was submitted in May 2015\nHad initially expected to FD in early 2015, now postponed so as to capture contracting\ncosts\nLely delayed for some time. The project had been delayed previously in 2013 by Chevron\nbecause of rising costs though the company has pointed to recent changes to the project to\nreduce costs\nCobalt guide is for YES aroject sanction with development engely to continue unti\nProject\nCountry\nProject Type\nОреговог\nParticipants\nProd Sta\n4\nPeak Pr\n\"\nCato\nJean Setup\nNorway\nShallow\nStatol\nMaria\nNorway\nDW\nWintershall\nun 22%, Norwa\nState 12, Det Norske 12, Menk\nOil and Gas\n(Wintershall 50%, Norway State 30%,\nCentrica 20\n7020\n2004\n2018\n2019\n50\nNorway\nStallow\nP\nPremier 50 KUFPEC 30%, Tul\n20%)\n2000\n2000\nRosebank\nLIK\nDWW\nChevron\nOMV (50%, CVX 40%, DONG 108)\n2020\n2022\nCamera\nAngola\nLOW\nCobat\n(Somangols 60%, Cose\n2018\n2005\nBonga SW\nNigerial\nDW\nShell\n(CVX 20%, 20% and 20%\nSvenska 20%, NPDC 15%, Sasol 3%)\n2000\n2004\n170\nOPL245-\nNigenal\nJOW\n(EN 50% She 500\n2019\n7028\n90\nBos\nNigeria\nDW\nExxonMobil\n(XOM 56.25%, Shel 43.75%)\n2024\n2025+\n160\nShell as confirmed progress toward RDIn the late 2015/early 2016 timeframe for the Bongo\nSW/Apero project. The project would include the construction of a new FPSD with expected\npeak capacity of 225 Mb/d. WMestimates \"135 Mb/d in oil production by 2022 (2 years after\nfirst oil.\nWM start-update of 2005 Production estimate includes and nearby\nZalazaba\nInitially conceived as a tieback to the Erha FPSD but with successful appraisal, site of the\nfeld has increased. Exxonlikely to develop in phases with a dedicated PSO\nWoodmac assumes Uge to be astancial one development with a leased 300 Mb/d FPSO\nNigeria\nDWW\nExxon Mobil\n(CVX 20 X 20, 20\nSvensics 20%, NPO 15%,\n2029\n2025\n75\n(0.5, Hon 24%, CVX\nMad Dog 2\nUS\nDW\n2021\n2023\nBP guidance is for likely sanctioning by VE15\n15.5%\nAppomatox\nUnited States\nLOW\nShell\n(She 80, Never 2003\n2019\n7025\n119\nShell has noted that Appomattox remains the most attractive candidate for in 2015\nShenandoah\nUnited States\nUDW\nAnadarko\n(APC 30%, COP 30%, Cobalt 20%,\nMRO 10%, Venan 10%)\n2000\n2006\n60\nVite\nUn ted States\nOW\nShe\n(She 51%, Stato 34Freeport\n1594\nWood\n2021\n2003\n47\nKaskida\nUnited States\nUOW\nBPP\nBP(300)\n2022\n2027\n06\nV\nBarl\nLOWW\nPetrobras\nPets (100)\n7021\n2003\nFPSO capacity\nof 150 Mb/d\nParque das Belelas\nBra\nDWW\nPetrobras\nVarious\n2008+\n70270+\n300\nBran\nJOW\nPetrobras\nPetras (100)\n2001\n2004\nTengiz Projects\n(FGP, WPMP)\nKazachstan\nOnshore\nTengachevrol\n(CVX 50%, XOM 25%, Karuna Gas\n20% Lukoil 5%)\n2021\n2024\n300\nPearls\nKarastan\n(Shell S, Kaz M2, Oman\nStallow Cal Meet\n24000\n2004\nTO\nappraisal well being planned. 3rd appraisal well expected to spud before end of 20\nassumes first product on will be achieved in 2021 va a cry tree TP city\nof 30 Mod of of. WoodMac doesn't assume FID 2017\nWMassumes field will start production in 2022 with a stand-alone spar\nCurrently, Petrobras has not contracted for the envisioned th and last FPSO for the Buzos\ndevelopment.\nof\nIncludes Baleia Ana, taipu, Pirambu in total Wood Mac estimates that-300MB\nproduction capacity to be needed with production starting in 2018 with the small Balea Ana\nfield; however, we note risk to a near-term production production outlook as high local\nequirements for these projects further cloud issues around Brazilian production.\nDeclaration of Commercality filed on Dec 30 2004; however, not yet moved towards F\ntanginally targeted mid-2015) Petrobras targeting fist in 2018 vs Woodin 2023 on\ndelays associated with construction of FPSO\nTCO is expected to sanction the FGP and WPMP projects by YE2015 Woodmac expects first\nproduction in 2021:\nFGP will consist of two main elements: drilling more wells to raise oil production and\nIncreasing sour gas injection. Expected to lift name plate capacity by another 260 Mb/d\nWPMP will serve entire field and is expected to increase long-term recovery from fields by\nlower pressure. Expected to contribute 50 Mb/d of all production at peak.\nWood Mecere estimates first product in 20120\nSource: Deutsche Bank, Wood Mackenzie, IEA Company Reports\nDeutsche Bank Securities Inc.\nCONFIDENTIAL - PURSUANT TO FED. R. CRIM. P. 6(e)\nCONFIDENTIAL\nPage 19\nDB-SDNY-0058870\nSDNY_GM_00205054\nEFTA01367337\n", "char_count": 4606}]}